S02040 Summary:
BILL NO | S02040 |
  | |
SAME AS | SAME AS A04311 |
  | |
SPONSOR | LAVALLE |
  | |
COSPNSR | |
  | |
MLTSPNSR | |
  | |
Amd §1020-ii, Pub Auth L | |
  | |
Relates to public notice before approval of utility transmission facilities. |
S02040 Actions:
BILL NO | S02040 | |||||||||||||||||||||||||||||||||||||||||||||||||
  | ||||||||||||||||||||||||||||||||||||||||||||||||||
01/18/2019 | REFERRED TO RULES | |||||||||||||||||||||||||||||||||||||||||||||||||
01/22/2019 | ORDERED TO THIRD READING CAL.42 | |||||||||||||||||||||||||||||||||||||||||||||||||
02/11/2019 | PASSED SENATE | |||||||||||||||||||||||||||||||||||||||||||||||||
02/11/2019 | DELIVERED TO ASSEMBLY | |||||||||||||||||||||||||||||||||||||||||||||||||
02/11/2019 | referred to corporations, authorities and commissions | |||||||||||||||||||||||||||||||||||||||||||||||||
02/28/2019 | substituted for a4311 | |||||||||||||||||||||||||||||||||||||||||||||||||
02/28/2019 | ordered to third reading cal.65 | |||||||||||||||||||||||||||||||||||||||||||||||||
02/28/2019 | passed assembly | |||||||||||||||||||||||||||||||||||||||||||||||||
02/28/2019 | returned to senate | |||||||||||||||||||||||||||||||||||||||||||||||||
08/23/2019 | DELIVERED TO GOVERNOR | |||||||||||||||||||||||||||||||||||||||||||||||||
08/29/2019 | SIGNED CHAP.201 |
S02040 Committee Votes:
Go to topS02040 Floor Votes:
Yes
Abbate
Yes
Crespo
ER
Gantt
Yes
LiPetri
Yes
Perry
Yes
Simon
Yes
Abinanti
Yes
Crouch
ER
Garbarino
Yes
Lupardo
Yes
Pheffer Amato
Yes
Simotas
Yes
Arroyo
Yes
Cruz
Yes
Giglio
Yes
Magnarelli
Yes
Pichardo
Yes
Smith
Yes
Ashby
Yes
Cusick
Yes
Glick
Yes
Malliotakis
Yes
Pretlow
Yes
Smullen
Yes
Aubry
Yes
Cymbrowitz
Yes
Goodell
Yes
Manktelow
Yes
Quart
Yes
Solages
Yes
Barclay
Yes
Davila
Yes
Gottfried
Yes
McDonald
Yes
Ra
Yes
Stec
Yes
Barnwell
Yes
De La Rosa
Yes
Griffin
Yes
McDonough
Yes
Raia
Yes
Steck
Yes
Barrett
Yes
DenDekker
Yes
Gunther
Yes
McMahon
Yes
Ramos
Yes
Stern
Yes
Barron
Yes
DeStefano
ER
Hawley
Yes
Mikulin
Yes
Raynor
Yes
Stirpe
Yes
Benedetto
ER
Dickens
Yes
Hevesi
Yes
Miller B
Yes
Reilly
ER
Tague
ER
Bichotte
Yes
Dilan
Yes
Hunter
Yes
Miller MG
Yes
Reyes
Yes
Taylor
ER
Blake
Yes
Dinowitz
Yes
Hyndman
Yes
Miller ML
Yes
Richardson
Yes
Thiele
Yes
Blankenbush
ER
DiPietro
Yes
Jacobson
Yes
Montesano
Yes
Rivera
ER
Titus
Yes
Brabenec
ER
D'Urso
Yes
Jaffee
Yes
Morinello
Yes
Rodriguez
Yes
Vanel
Yes
Braunstein
Yes
Eichenstein
Yes
Jean-Pierre
Yes
Mosley
Yes
Romeo
Yes
Walczyk
Yes
Bronson
Yes
Englebright
Yes
Johns
Yes
Niou
Yes
Rosenthal D
Yes
Walker
Yes
Buchwald
Yes
Epstein
Yes
Jones
Yes
Nolan
Yes
Rosenthal L
Yes
Wallace
Yes
Burke
Yes
Fahy
Yes
Joyner
Yes
Norris
Yes
Rozic
Yes
Walsh
Yes
Buttenschon
Yes
Fall
Yes
Kim
ER
O'Donnell
Yes
Ryan
Yes
Weinstein
Yes
Byrne
Yes
Fernandez
ER
Kolb
Yes
Ortiz
Yes
Salka
Yes
Weprin
Yes
Byrnes
Yes
Finch
Yes
Lalor
Yes
Otis
Yes
Santabarbara
Yes
Williams
Yes
Cahill
Yes
Fitzpatrick
Yes
Lavine
Yes
Palmesano
Yes
Sayegh
Yes
Woerner
Yes
Carroll
Yes
Friend
Yes
Lawrence
Yes
Palumbo
Yes
Schimminger
Yes
Wright
Yes
Colton
Yes
Frontus
Yes
Lentol
Yes
Paulin
Yes
Schmitt
Yes
Zebrowski
Yes
Cook
Yes
Galef
Yes
Lifton
Yes
Peoples-Stokes
Yes
Seawright
Yes
Mr. Speaker
‡ Indicates voting via videoconference
S02040 Text:
Go to top STATE OF NEW YORK ________________________________________________________________________ 2040 2019-2020 Regular Sessions IN SENATE January 18, 2019 ___________ Introduced by Sen. LAVALLE -- read twice and ordered printed, and when printed to be committed to the Committee on Rules AN ACT to amend the public authorities law, in relation to public notice before approval of utility transmission facilities The People of the State of New York, represented in Senate and Assem- bly, do enact as follows: 1 Section 1. Section 1020-ii of the public authorities law, as added by 2 a chapter of the laws of 2018 amending the public authorities law relat- 3 ing to requiring the Long Island Power Authority to provide public 4 notice for the construction of utility transmission facilities, as 5 proposed in legislative bill numbers S.6861-A and A.8609-A, is amended 6 to read as follows: 7 § 1020-ii. Public notice before approval of utility transmission 8 facilities. 1. As used in this section, the following terms shall have 9 the following meanings: 10 (a) "municipality" means a county, city, town or village in the 11 service area; 12 (b) "utility transmission facility" means any electric transmission 13 line operating at sixty-five kilovolts or higher in the service area, 14 including associated equipment. It shall not include any transmission 15 line which is an in-kind replacement or which is located wholly under- 16 ground. This section also shall not apply to any major utility trans- 17 mission facility subject to the jurisdiction of article seven of the 18 public service law; and 19 (c) "[utility] authority customer" means the customer of record 20 located within five hundred feet of a proposed utility transmission 21 facility. 22 2. The authority shall not construct any utility transmission facility 23 without first providing public notice as provided by this subdivision. 24 Such public notice shall be provided by the authority before the envi- 25 ronmental significance of such action is determined by the authority, EXPLANATION--Matter in italics (underscored) is new; matter in brackets [] is old law to be omitted. LBD07036-01-9S. 2040 2 1 pursuant to article eight of the environmental conservation law. The 2 public notice shall provide the following information: 3 (a) the location of the site or right-of-way; 4 (b) a description of the transmission facility to be built thereon; 5 (c) [the environmental assessment or environmental impact statement6prepared for the action, pursuant to article eight of the environmental7conservation law;8(d)] a summary of any studies including an environmental assessment or 9 environmental impact statement pursuant to article eight of the environ- 10 mental conservation law which have been made of the environmental impact 11 of the project, and a description of such studies; 12 [(e)] (d) a statement explaining the need for the facility; 13 [(f)] (e) a description of any reasonable alternate location or 14 locations assessed for the proposed facility; 15 [(g)] (f) a description of the comparative merits and detriments of 16 each location submitted; and 17 [(h)] (g) a statement of the reasons why the primary proposed location 18 is best suited for the facility. 19 [Copies] When completed, copies of the environmental assessment form, 20 environmental impact statement and studies referred to in the notice 21 shall be filed with the authority and shall be available for public 22 inspection. 23 3. Notice shall be provided by first class mail to: 24 (a) each municipality in which any portion of such facility is to be 25 located, both as primarily proposed and in the alternative locations 26 listed. Notice to a municipality shall be addressed to the chief execu- 27 tive officer thereof; 28 (b) each member of the legislature through whose district the utility 29 transmission facility or any alternate proposed [in the application] 30 would pass; and 31 (c) each [utility] authority customer. 32 § 2. This act shall take effect on the same date and in the same 33 manner as a chapter of the laws of 2018 amending the public authorities 34 law relating to requiring the Long Island Power Authority to provide 35 public notice for the construction of utility transmission facilities, 36 as proposed in legislative bill numbers S.6861-A and A.8609-A, takes 37 effect.