A06431 Summary:

BILL NOA06431
 
SAME ASSAME AS S06209
 
SPONSORMagnarelli
 
COSPNSR
 
MLTSPNSR
 
Amd Part A-4 §5, Chap 58 of 2006
 
Increases from three million dollars to four millions dollars the cost of 10 projects which shall be located at the STEM at Blodgett Middle School, the Corcoran High School, the Delaware Primary School, the Henninger High School, the Syracuse Latin School, the Lincoln Middle School, the Nottingham High School, the Roberts PreK-8 School, the Seymour Dual Language Academy and the Webster Elementary School.
Go to top    

A06431 Actions:

BILL NOA06431
 
04/06/2023referred to education
05/24/2023reported referred to ways and means
06/05/2023reported referred to rules
06/05/2023reported
06/05/2023rules report cal.522
06/05/2023ordered to third reading rules cal.522
06/05/2023passed assembly
06/05/2023delivered to senate
06/05/2023REFERRED TO RULES
06/05/2023SUBSTITUTED FOR S6209
06/05/20233RD READING CAL.1384
06/05/2023PASSED SENATE
06/05/2023RETURNED TO ASSEMBLY
10/13/2023delivered to governor
10/25/2023signed chap.569
Go to top

A06431 Memo:

NEW YORK STATE ASSEMBLY
MEMORANDUM IN SUPPORT OF LEGISLATION
submitted in accordance with Assembly Rule III, Sec 1(f)
 
BILL NUMBER: A6431
 
SPONSOR: Magnarelli
  TITLE OF BILL: An act to amend the city of Syracuse and the board of education of the city school district of the city of Syracuse cooperative school recon- struction act, in relation to construction and design contracts entered into by the JSC Board   PURPOSE: This legislation increases the maximum bonding limit for Phase III of the Syracuse Joint Schools Construction Board from $300 to $400 million.   SUMMARY OF PROVISIONS: Section 1: increases the maximum bonding limit for Phase III of the Syracuse Joint Schools Construction Board from $300 to $400 million. Section 2: Sets the effective date.   JUSTIFICATION: In 2021 with Chapter 617 the Legislature authorized a third phase of renovations for Syracuse City School buildings through the Joint Schools Construction Board. It originally authorized up to $300 million in bond- ing. However, due to inflation and other external factors, construction costs have risen sharply. Authorizing an additional $100 million in bonding will ensure the Joint Schools Construction Board can finish planned Phase III projects and provide Syracuse City School students with up to date facilities.   LEGISLATIVE HISTORY: New Bill, amending chapter 617 of 2021.   FISCAL IMPACT: To be determined.   EFFECTIVE DATE: This act shall take effect immediately.
Go to top

A06431 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                          6431
 
                               2023-2024 Regular Sessions
 
                   IN ASSEMBLY
 
                                      April 6, 2023
                                       ___________
 
        Introduced  by  M.  of  A.  MAGNARELLI  -- read once and referred to the
          Committee on Education
 
        AN ACT to amend the city of Syracuse and the board of education  of  the
          city school district of the city of Syracuse cooperative school recon-
          struction  act,  in  relation  to  construction  and  design contracts
          entered into by the JSC Board

          The People of the State of New York, represented in Senate and  Assem-
        bly, do enact as follows:
 
     1    Section  1.  Section  5  of part A-4 of chapter 58 of the laws of 2006
     2  enacting the "city of Syracuse and the board of education  of  the  city
     3  school  district  of  the  city  of  Syracuse  cooperative school recon-
     4  struction act", as amended by chapter  617  of  the  laws  of  2021,  is
     5  amended to read as follows:
     6    §  5.  (a)  No  more than seven projects, one each at the Central High
     7  School, the Blodgett School, the Shea  Middle  School,  the  H.W.  Smith
     8  Elementary  School,  the  Clary  Middle School, the Dr. Weeks Elementary
     9  School and the Fowler High School, up to a total  cost  of  two  hundred
    10  twenty-five  million dollars; and (b) no more than twenty projects which
    11  shall be located at the Bellevue Elementary  School,  the  Clary  Middle
    12  School, the Corcoran High School, the Danforth Middle School, the Edward
    13  Smith  K-8  School, the Expeditionary Learning Middle School, the Fowler
    14  High School, the Frazer K-8 School, the Grant Middle School,  the  Grey-
    15  stone  Building,  the  Henninger High School, the Huntington K-8 School,
    16  the Nottingham High School, the Shea  Middle  School  and  the  Westside
    17  Academy  at  Blodgett,  up  to  a  total  cost  of three hundred million
    18  dollars; and (c) no more than 10 projects, which shall be located at the
    19  STEM at Blodgett Middle School, the Corcoran High School,  the  Delaware
    20  Primary  School,  the  Henninger High School, the Syracuse Latin School,
    21  the Lincoln Middle School,  the  Nottingham  High  School,  the  Roberts
    22  PreK-8 School, the Seymour Dual Language Academy and the Webster Elemen-
    23  tary School, up to a total cost of [three] four hundred million dollars,
    24  shall  be  authorized and undertaken pursuant to this act, unless other-
    25  wise authorized by law.
    26    § 2. This act shall take effect immediately.
 