- Summary
- Actions
- Floor Votes
- Memo
- Text
A05412 Summary:
| BILL NO | A05412A |
|   | |
| SAME AS | SAME AS UNI. S03414-A |
|   | |
| SPONSOR | Cusick |
|   | |
| COSPNSR | Robinson |
|   | |
| MLTSPNSR | Rivera P |
|   | |
| Amd S139-f, St Fin L; amd S106-b, Gen Muni L | |
|   | |
| Authorizes contractors or subcontractors to postpone commencing work until proposed changes exceeding 10% of the original contract have been approved by the public owner. | |