A09560 Summary:

BILL NO    A09560 

SAME AS    SAME AS S06670

SPONSOR    Brindisi (MS)

COSPNSR    Cahill, Rivera P

MLTSPNSR   Amedore

Amd S66-j, Pub Serv L

Authorizes remote net metering by farm and non-residential customer-generators
using micro-hydroelectric generating equipment.
Go to top

A09560 Actions:

BILL NO    A09560 

03/16/2012 referred to energy
05/01/2012 reported 
05/03/2012 advanced to third reading cal.527
05/07/2012 substituted by s6670
           S06670  AMEND=  LITTLE
           03/08/2012 REFERRED TO ENERGY AND TELECOMMUNICATIONS
           03/27/2012 1ST REPORT CAL.470
           03/28/2012 2ND REPORT CAL.
           03/29/2012 ADVANCED TO THIRD READING 
           04/19/2012 PASSED SENATE
           04/19/2012 DELIVERED TO ASSEMBLY
           04/19/2012 referred to energy
           05/07/2012 substituted for a9560
           05/07/2012 ordered to third reading cal.527
           05/07/2012 passed assembly
           05/07/2012 returned to senate
           07/20/2012 DELIVERED TO GOVERNOR
           08/01/2012 SIGNED CHAP.318
Go to top

A09560 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                          9560
 
                   IN ASSEMBLY
 
                                     March 16, 2012
                                       ___________
 
        Introduced by M. of A. BRINDISI, CAHILL -- read once and referred to the
          Committee on Energy
 
        AN ACT to amend the public service law, in relation to remote net energy
          metering  by farm and non-residential customer-generators using micro-
          hydroelectric generating equipment
 
          The People of the State of New York, represented in Senate and  Assem-
        bly, do enact as follows:
 

     1    Section  1.  Subparagraphs (vi) and (vii) of paragraph (a) of subdivi-
     2  sion 1 of section 66-j of the public service law, subparagraph  (vi)  as
     3  added by chapter 546 of the laws of 2011, are redesignated subparagraphs
     4  (vii) and (viii).
     5    §  2.  Subdivision  3  of  section  66-j  of the public service law is
     6  amended by adding a new paragraph (f) to read as follows:
     7    (f) A customer who owns or operates a farm operation as such  term  is
     8  defined  in subdivision eleven of section three hundred one of the agri-
     9  culture and markets law,  or  a  non-residential  customer-generator  as
    10  defined  by  subparagraph  (viii) of paragraph (a) of subdivision one of
    11  this section that locates micro-hydroelectric generating equipment  with
    12  a  net energy meter on property owned or leased by such customer-genera-

    13  tor may designate all or a portion of the net metering credits generated
    14  by such equipment to meters at any property  owned  or  leased  by  such
    15  customer-generator  within  the  service  territory of the same electric
    16  corporation to which the  customer-generator's  net  energy  meters  are
    17  interconnected  and being within the same load zone as determined by the
    18  location based marginal price as of the date of initial request  by  the
    19  customer-generator  to  conduct  net  metering. The electric corporation
    20  will credit the accounts of the customer by applying any credits to  the
    21  highest  use  meter  first, then subsequent highest use meters until all
    22  such credits are attributed to the customer. Any excess credits shall be

    23  carried over to the following month.
    24    § 3. This act shall take effect immediately.
 
 
         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD14908-02-2
Go to top
Page display time = 0.0793 sec