A03579 Summary:

BILL NOA03579
 
SAME ASSAME AS S06504
 
SPONSORBrindisi
 
COSPNSR
 
MLTSPNSR
 
Amd S10, Can L
 
Adds powers and duties to the canal corporation; directs the canal corporation to cause the design, preparation of plans, estimates and specifications and the supervision of the erection, construction, repair and removal of all structures referred to be performed by a licensed professional engineer; directs preparation of a flood response plan; makes related provisions.
Go to top    

A03579 Actions:

BILL NOA03579
 
01/28/2013referred to corporations, authorities and commissions
01/08/2014referred to corporations, authorities and commissions
Go to top

A03579 Floor Votes:

There are no votes for this bill in this legislative session.
Go to top

A03579 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                          3579
 
                               2013-2014 Regular Sessions
 
                   IN ASSEMBLY
 
                                    January 28, 2013
                                       ___________
 
        Introduced by M. of A. BRINDISI -- read once and referred to the Commit-
          tee on Corporations, Authorities and Commissions
 
        AN  ACT  to  amend  the canal law, in relation to the general powers and
          duties of the canal corporation
 
          The People of the State of New York, represented in Senate and  Assem-
        bly, do enact as follows:

 
     1    Section  1.  Subdivision 16 of section 10 of the canal law, as amended
     2  by chapter 335 of the laws of 2001, is amended and three new    subdivi-
     3  sions 3-a, 9-b and 9-c are added to read as follows:
     4    3-a.  Cause the design, preparation of plans, estimates and specifica-
     5  tions and the supervision of  the  erection,  construction,  repair  and
     6  removal  of  all  structures  heretofore  referred  to be performed by a
     7  licensed professional engineer.
     8    9-b. Operate the canal system in such a manner which mitigates  flood-
     9  ing along the system to protect to the extent possible life and property
    10  on  and  along  the  canal  system  when  expected and actual conditions
    11  warrant.
    12    9-c. Cause a flood response plan to be created to respond to  expected

    13  and actual flooding in the canal system.
    14    (1) The flood response plan shall include, but not be limited to:
    15    (i) a plan of action for communication with mariners, county emergency
    16  managers  and  appropriate officials, and the state emergency management
    17  office;
    18    (ii) internal command and reporting coordination;
    19    (iii) canal infrastructure operation, to include preemptive  measures;
    20  and
    21    (iv)  other  elements as determined by the corporation and the depart-
    22  ment of environmental conservation.
    23    (2) Such plan shall be prepared in consultation with the  state  emer-
    24  gency management office and emergency managers from counties adjacent or
 

         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD07255-01-3

        A. 3579                             2
 
     1  intersected  by  the  canal  system and the completed plan must be filed
     2  with the offices thereof.
     3    (3) The corporation shall submit a copy of such plan to the department
     4  of environmental conservation within six months of the effective date of
     5  this subdivision, and annually update and submit such plan thereafter.
     6    16.  Cause to be removed from canal lands and waters any encroachments
     7  which in its judgment are detrimental, including the removal of debris.

     8    § 2. This act shall take effect immediately.