•  Summary 
  •  
  •  Actions 
  •  
  •  Committee Votes 
  •  
  •  Floor Votes 
  •  
  •  Memo 
  •  
  •  Text 
  •  
  •  LFIN 
  •  
  •  Chamber Video/Transcript 

A11685 Summary:

BILL NOA11685
 
SAME ASNo Same As
 
SPONSORRules (Simone)
 
COSPNSR
 
MLTSPNSR
 
Amd §381, Exec L; amd §28-105.5, NYC Ad Cd
 
Requires local building departments to process and approve or deny applications for residential or mixed-use buildings within 30 days; provides that if the local department does not process the application within the required timeframe an applicant shall be permitted to retain a private professional to perform the permit review to determine compliance with state and/or local building codes.
Go to top

A11685 Floor Votes:

There are no Assembly votes for this bill in this legislative session.
Go to top