A02605 Summary:

BILL NOA02605A
 
SAME ASSAME AS S10316-A
 
SPONSORSayegh
 
COSPNSRJacobson, Santabarbara, Otis
 
MLTSPNSR
 
Add §§54 & 89-q, Pub Serv L; add Art 5 Title 1-A §1020-oo, Pub Auth L
 
Requires the results of any outage management system stress test conducted in the state by a utility company to be posted online and such results to be sent to the temporary president of the senate, the speaker of the assembly and the chairs of the senate and assembly standing committees on energy.
Go to top

A02605 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                         2605--A
                                                                Cal. No. 448
 
                               2025-2026 Regular Sessions
 
                   IN ASSEMBLY
 
                                    January 21, 2025
                                       ___________
 
        Introduced by M. of A. SAYEGH, JACOBSON, SANTABARBARA, OTIS -- read once
          and referred to the Committee on Corporations, Authorities and Commis-
          sions -- recommitted to the Committee on Corporations, Authorities and
          Commissions  in accordance with Assembly Rule 3, sec. 2 -- advanced to
          a third reading, passed by  Assembly  and  delivered  to  the  Senate,
          recalled  from  the  Senate,  vote reconsidered, bill amended, ordered
          reprinted, retaining its place on the order of third reading
 
        AN ACT to amend the public service law and the public  authorities  law,
          in  relation  to requiring the results of any outage management system
          stress test conducted in the state by a utility company to  be  posted
          online
 
          The  People of the State of New York, represented in Senate and Assem-
        bly, do enact as follows:
 
     1    Section 1. The public service law is amended by adding a  new  section
     2  54 to read as follows:
     3    §  54.  Utility  outage  management  system  stress  testing. 1.   For
     4  purposes of this section, "outage management system stress  test"  shall
     5  mean  a  test  conducted  by  a utility to determine the ability of such
     6  utility to handle and respond to large scale weather events  or  natural
     7  disasters that are likely to result in the loss of service to customers.
     8    2.  (a) The department shall post the results of any outage management
     9  system stress test conducted in the state by a gas, electric, or  combi-
    10  nation  gas  and  electric utility corporation, or municipal electric or
    11  gas on the department's website as soon as such  results  become  avail-
    12  able.
    13    (b)  The commission shall also submit an annual report of such results
    14  to the governor, the temporary president of the senate, the  speaker  of
    15  the  assembly and the chairs of the senate and assembly standing commit-
    16  tees on energy.
 
         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD02711-03-6

        A. 2605--A                          2
 
     1    § 2. Title 1-A of article 5 of the public authorities law, as added by
     2  chapter 517 of the laws of 1986, is amended  by  adding  a  new  section
     3  1020-oo to read as follows:
     4    §  1020-oo.   Outage management system stress testing. 1. For purposes
     5  of this section, "outage management system stress  test"  shall  mean  a
     6  test  conducted  by the authority or a service provider to determine the
     7  ability of the authority or such service provider to handle and  respond
     8  to  large  scale  weather events or natural disasters that are likely to
     9  result in the loss of service to customers.
    10    2. (a) The authority shall post the results of any  outage  management
    11  system  stress  test conducted by the authority or a service provider on
    12  the authority's website as soon as such results become available.
    13    (b) The board shall also submit a report of such results to the gover-
    14  nor, the temporary president of the senate, the speaker of the  assembly
    15  and the chairs of the senate and assembly standing committees on energy.
    16    § 3. The public service law is amended by adding a new section 89-q to
    17  read as follows:
    18    §  89-q.  Utility  outage  management  system  stress  testing. 1. For
    19  purposes of this section, "outage management system stress  test"  shall
    20  mean  a  test  conducted  by  a utility to determine the ability of such
    21  utility to handle and respond to large scale weather events  or  natural
    22  disasters that are likely to result in the loss of service to customers.
    23    2.  (a) The department shall post the results of any outage management
    24  system stress test conducted in the state by a  waterworks  corporation,
    25  or  municipal  water systems on the department's website as soon as such
    26  results become available.
    27    (b) The commission shall also submit an annual report of such  results
    28  to  the  governor, the temporary president of the senate, the speaker of
    29  the assembly and the chairs of the senate and assembly standing  commit-
    30  tees on energy.
    31    § 4. This act shall take effect immediately.