A04127 Summary:

BILL NOA04127A
 
SAME ASSAME AS S01227-A
 
SPONSORStirpe
 
COSPNSRBronson, Zinerman
 
MLTSPNSR
 
 
Authorizes and directs the department of public service to conduct a study on the deployment of energy interconnection processes into the electrical grid to meet the state's renewable energy goals; directs the department of public service to submit a report on its findings one year after the effective date.
Go to top

A04127 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                         4127--A
 
                               2025-2026 Regular Sessions
 
                   IN ASSEMBLY
 
                                    January 31, 2025
                                       ___________
 
        Introduced by M. of A. STIRPE -- read once and referred to the Committee
          on  Energy -- committee discharged, bill amended, ordered reprinted as
          amended and recommitted to said committee
 
        AN ACT to authorize and direct  the  department  of  public  service  to
          conduct  a study on the deployment of energy interconnection processes
          into the electrical grid
 
          The People of the State of New York, represented in Senate and  Assem-
        bly, do enact as follows:
 
     1    Section  1.  Study. The department of public service is authorized and
     2  directed to conduct a study on the regulatory barriers, if any,  to  the
     3  rapid  deployment  of energy interconnection processes in the state that
     4  shall include, but not be limited to:
     5    (a) Potential changes to the interconnection process to rapidly  bring
     6  new renewable energy onto the electrical grid to meet the state's renew-
     7  able  energy  goals  set  out under the climate leadership and community
     8  protection act, as amended;
     9    (b) The state's ability  to  comply  with  goals  established  in  the
    10  climate  leadership  and  community  protection  act,  as  amended, with
    11  current energy interconnection process timelines, including  the  effect
    12  of  recent  reforms by the federally designated bulk system operator and
    13  any additional anticipated reforms;
    14    (c) The experience of other interconnection systems using "Connect and
    15  Manage" or other alternative connection agreements in terms of the speed
    16  of resource deployments and electrical grid reliability;
    17    (d) The extent to which the studies  and  network  upgrades  currently
    18  required  for  projects by the federally designated bulk system operator
    19  go beyond the minimal set of studies  and  network  upgrades  needed  to
    20  safely operate the system with a new resource;
    21    (e)  Whether it is possible to identify more efficient system upgrades
    22  in the context of New York's federally designated bulk system operator's
 
         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD03676-04-5

        A. 4127--A                          2
 
     1  comprehensive system planning process rather than  certain  studies  and
     2  upgrades currently in the energy interconnection process;
     3    (f)  Improvements  to the interconnection process for qualified energy
     4  storage systems as defined by subdivision 1 of section 74 of the  public
     5  service law; and
     6    (g)  Whether  any changes identified in this study at the transmission
     7  level would also improve processes at the distribution level.
     8    § 2. Report. No later than one year after the effective date  of  this
     9  act,  the department of public service shall submit to the governor, the
    10  speaker of the assembly and the temporary president  of  the  senate,  a
    11  report  assessing  its  findings  under  the study conducted pursuant to
    12  section one of this act, and any recommendations to  rapidly  bring  new
    13  renewable  energy onto the electrical grid to meet the state's renewable
    14  energy  goals  set  out  under  the  climate  leadership  and  community
    15  protection act, as amended.
    16    §  3.  Definitions.  For the purposes of this act, the following terms
    17  shall have the following meanings:
    18    (a) "Energy interconnection process" means the process of  integrating
    19  new  sources  of  renewable  energy,  as  defined by section 66-p of the
    20  public service law, into the electrical grid.
    21    (b) "Electrical grid" means the network of electric plants  and  other
    22  electric  generating  facilities  and  equipment, and electricity trans-
    23  mission and distribution systems in the state.
    24    (c) "Renewable energy" shall have  the  same  meaning  as  defined  by
    25  section 66-p of the public service law.
    26    § 4. This act shall take effect immediately.