•  Summary 
  •  
  •  Actions 
  •  
  •  Committee Votes 
  •  
  •  Floor Votes 
  •  
  •  Memo 
  •  
  •  Text 
  •  
  •  LFIN 
  •  
  •  Chamber Video/Transcript 

A00491 Summary:

BILL NOA00491A
 
SAME ASSAME AS S00098-A
 
SPONSORWoerner
 
COSPNSRGriffin
 
MLTSPNSR
 
Add §66-x, Pub Serv L
 
Requires electric corporations build make-ready infrastructure to facilitate the charging of electric public serving fleet vehicles.
Go to top

A00491 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                         491--A
 
                               2025-2026 Regular Sessions
 
                   IN ASSEMBLY
 
                                       (Prefiled)
 
                                     January 8, 2025
                                       ___________
 
        Introduced by M. of A. WOERNER, GRIFFIN -- read once and referred to the
          Committee  on  Energy  --  committee discharged, bill amended, ordered
          reprinted as amended and recommitted to said committee
 
        AN ACT to amend the public service law, in relation  to  building  make-
          ready  electrical infrastructure for the charging of electric vehicles
          for public serving fleet vehicles
 
          The People of the State of New York, represented in Senate and  Assem-
        bly, do enact as follows:
 
     1    Section  1.  The public service law is amended by adding a new section
     2  66-x to read as follows:
     3    § 66-x. Make-ready electrical infrastructure.  1.  Legislative  intent
     4  and  purpose.  It is the intent and purpose of this section to implement
     5  cost effective and unified treatment by electric corporations  of  elec-
     6  trical  distribution  infrastructure,  and  certain customer-owned make-
     7  ready infrastructure, needed to charge  electric  public  serving  fleet
     8  vehicles;  and  provide  for  certain costs of such infrastructure to be
     9  included in electric corporations' rate bases  and  generally  recovered
    10  through rates or surcharges, instead of directly from the public serving
    11  fleet  customers  served by such infrastructure. Nothing in this section
    12  shall modify any obligation of an electric corporation to provide a full
    13  and accurate accounting of  costs  related  to  electrical  distribution
    14  infrastructure needed to charge electric vehicles.
    15    2.  Definitions.  For the purposes of this section the following terms
    16  shall have the following meanings:
    17    (a) "Electrical distribution infrastructure" means any utility facili-
    18  ties used to distribute electric  service  to  customers,  and  includes
    19  poles,  vaults,  service  drops, transformers, mounting pads, trenching,
    20  conduit, wire, cable, meters, other equipment as necessary, and  associ-
    21  ated engineering and civil construction work.
 
         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD00265-03-5

        A. 491--A                           2
 
     1    (b)  "Utility-owned  make-ready costs" means any capital investment in
     2  electrical distribution infrastructure needed to connect and serve a new
     3  electric vehicle charger, including  step  down  transformers,  overhead
     4  service lines, and utility meters.
     5    (c)  "Customer-owned make-ready costs" means any capital investment in
     6  equipment or infrastructure beyond the utility service  point  necessary
     7  to  make  a  site ready to accept an electric vehicle charger, including
     8  conductors, trenching, and panels.
     9    (d) "Disadvantaged community" means a community defined as a disadvan-
    10  taged community under article seventy-five of the environmental  conser-
    11  vation law.
    12    (e) "Public serving fleet" means a fleet of vehicles owned, leased, or
    13  contracted  by  the  state, any municipality, public authority or school
    14  district.
    15    3. Reasonable  efforts  required.  Electric  corporations  shall  make
    16  reasonable  efforts  to ensure that any infrastructure built pursuant to
    17  this section  is  efficiently  sized  and  operated.  Such  efforts  may
    18  include,  but not be limited to, considering customers' reasonably fore-
    19  seeable load management activities and deployments of distributed energy
    20  resources.
    21    4. Application. No later than sixty days after the effective  date  of
    22  this  section,  all electric corporations shall file an application with
    23  the commission to establish a tariff that shall replace the line  exten-
    24  sion rules currently used by such electric corporations. Such tariff, at
    25  a minimum, shall:
    26    (a)  provide  for such electric corporation to deploy or reimburse the
    27  customer's  reasonable  costs,  subject  to  reasonable  conditions,  of
    28  customer-side make-ready infrastructure for public serving fleets;
    29    (b)  authorize  such  electric corporation to include in its rate base
    30  one hundred percent of all reasonable and  prudent  utility-owned  make-
    31  ready  costs incurred to serve electric vehicle charging loads of public
    32  serving fleets;
    33    (c) authorize such electronic corporation to include in its base  rate
    34  of  reasonable  and  prudent  customer-side  make-ready  costs needed to
    35  prepare a public serving fleet's site for electric vehicle  charging  in
    36  the following manner:
    37    (i)  a minimum fifty percent or higher where authorized by the commis-
    38  sion, of reasonable customer-owned make-ready costs  in  locations  that
    39  are  not  within  a disadvantaged community or a disadvantaged community
    40  zone;
    41    (ii) a minimum ninety percent,  or  higher  where  authorized  by  the
    42  commission, of reasonable customer-owned make-ready costs located within
    43  a disadvantaged community or disadvantaged community zone; and
    44    (d)  provide  that  the  portion  of  customer-owned  make-ready costs
    45  included in the electric corporation's rate base shall  not  be  charged
    46  directly or solely to the customer served by such make-ready infrastruc-
    47  ture;  except  where the customer is not a public entity, and within ten
    48  years of receiving a customer-side make-ready incentive  at  a  location
    49  pursuant  to this section, reduces the number of electric public serving
    50  fleet vehicles operating at such location. The tariff shall provide  for
    51  the  electric corporation to recover a prorated portion of the customer-
    52  side make-ready incentive directly from the customer in such instance.
    53    5. Disadvantaged community zone. For the purposes of this section  the
    54  commission shall define the term "disadvantaged community zone".
    55    6. Cost treatment and recovery for utility-owned make-ready costs. All
    56  electric  corporations  shall  maintain  budgets  for its costs incurred

        A. 491--A                           3
 
     1  under this section.  The  portion  of  customer-owned  make-ready  costs
     2  incurred by an electric corporation pursuant to subdivision four of this
     3  section  shall  be  treated in accordance with a depreciation or amorti-
     4  zation  schedule  as  authorized  by the commission. Any electric corpo-
     5  ration may recover the incremental revenue requirement  associated  with
     6  such costs through a surcharge mechanism until its base rates are reset.
     7  Any  electric  corporation  seeking  to  recover  such  costs  through a
     8  surcharge mechanism shall include such proposal as part of its  applica-
     9  tion filed pursuant to subdivision four of this section.
    10    7.  Approval of tariffs. The commission shall, after notice and oppor-
    11  tunity for public comment and within ninety days of the  filing  of  the
    12  tariff, approve, or modify and approve, such tariff.
    13    § 2. This act shall take effect immediately.
Go to top