S10316 Summary:

BILL NOS10316A
 
SAME ASSAME AS A02605-A
 
SPONSORSKOUFIS
 
COSPNSR
 
MLTSPNSR
 
Add §§54 & 89-q, Pub Serv L; add Art 5 Title 1-A §1020-oo, Pub Auth L
 
Requires the results of any outage management system stress test conducted in the state by a utility company to be posted online and such results to be sent to the temporary president of the senate, the speaker of the assembly and the chairs of the senate and assembly standing committees on energy.
Go to top

S10316 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                        10316--A
 
                    IN SENATE
 
                                      May 13, 2026
                                       ___________
 
        Introduced  by  Sen. SKOUFIS -- read twice and ordered printed, and when
          printed to be committed to the Committee on  Energy  and  Telecommuni-
          cations  --  committee  discharged, bill amended, ordered reprinted as
          amended and recommitted to said committee
 
        AN ACT to amend the public service law and the public  authorities  law,
          in  relation  to requiring the results of any outage management system
          stress test conducted in the state by a utility company to  be  posted
          online
 
          The  People of the State of New York, represented in Senate and Assem-
        bly, do enact as follows:
 
     1    Section 1. The public service law is amended by adding a  new  section
     2  54 to read as follows:
     3    §  54.  Utility  outage  management  system  stress  testing. 1.   For
     4  purposes of this section, "outage management system stress  test"  shall
     5  mean  a  test  conducted  by  a utility to determine the ability of such
     6  utility to handle and respond to large scale weather events  or  natural
     7  disasters that are likely to result in the loss of service to customers.
     8    2.  (a) The department shall post the results of any outage management
     9  system stress test conducted in the state by a gas, electric, or  combi-
    10  nation  gas  and  electric utility corporation, or municipal electric or
    11  gas on the department's website as soon as such  results  become  avail-
    12  able.
    13    (b)  The commission shall also submit an annual report of such results
    14  to the governor, the temporary president of the senate, the  speaker  of
    15  the  assembly and the chairs of the senate and assembly standing commit-
    16  tees on energy.
    17    § 2. Title 1-A of article 5 of the public authorities law, as added by
    18  chapter 517 of the laws of 1986, is amended  by  adding  a  new  section
    19  1020-oo to read as follows:
    20    §  1020-oo.   Outage management system stress testing. 1. For purposes
    21  of this section, "outage management system stress  test"  shall  mean  a
    22  test  conducted  by the authority or a service provider to determine the
    23  ability of the authority or such service provider to handle and  respond
 
         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD02711-02-6

        S. 10316--A                         2
 
     1  to  large  scale  weather events or natural disasters that are likely to
     2  result in the loss of service to customers.
     3    2.  (a)  The authority shall post the results of any outage management
     4  system stress test conducted by the authority or a service  provider  on
     5  the authority's website as soon as such results become available.
     6    (b) The board shall also submit a report of such results to the gover-
     7  nor,  the temporary president of the senate, the speaker of the assembly
     8  and the chairs of the senate and assembly standing committees on energy.
     9    § 3. The public service law is amended by adding a new section 89-q to
    10  read as follows:
    11    § 89-q. Utility  outage  management  system  stress  testing.  1.  For
    12  purposes  of  this section, "outage management system stress test" shall
    13  mean a test conducted by a utility to  determine  the  ability  of  such
    14  utility  to  handle and respond to large scale weather events or natural
    15  disasters that are likely to result in the loss of service to customers.
    16    2. (a) The department shall post the results of any outage  management
    17  system  stress  test conducted in the state by a waterworks corporation,
    18  or municipal water systems on the department's website as soon  as  such
    19  results become available.
    20    (b)  The commission shall also submit an annual report of such results
    21  to the governor, the temporary president of the senate, the  speaker  of
    22  the  assembly and the chairs of the senate and assembly standing commit-
    23  tees on energy.
    24    § 4. This act shall take effect immediately.
Go to top