•  Summary 
  •  
  •  Actions 
  •  
  •  Committee Votes 
  •  
  •  Floor Votes 
  •  
  •  Memo 
  •  
  •  Text 
  •  
  •  LFIN 
  •  
  •  Chamber Video/Transcript 

S03107 Summary:

BILL NOS03107
 
SAME ASNo Same As
 
SPONSORCOONEY
 
COSPNSRFERNANDEZ, HARCKHAM, JACKSON, MAY, RAMOS, RYAN S, SKOUFIS
 
MLTSPNSR
 
Add §409-o, Ed L
 
Establishes a school ventilation and energy efficiency assessment, repair and verification program to require each school to: obtain an HVAC Assessment Report performed by qualified testing personnel documenting the functionality of the existing system or lack thereof, and obtain a report from a mechanical engineer identifying any upgrades, replacements or other measures recommended to improve the functionality, health and safety and/or energy efficiency of the HVAC system; adjust, and, if necessary, repair existing building HVAC systems, and install or replace HVAC systems, if necessary, to ensure proper and efficient operation, as well as compliance with health and safety standards; obtain an HVAC Verification Report performed by qualified testing personnel documenting any upgrades, replacements, installations or any other work performed on the HVAC system functions as designed and/or in compliance with health and safety standards; install CO2 sensors in classrooms, assembly areas, kitchen or cafeteria areas or building office spaces to provide ongoing verification that proper ventilation is maintained during operation; makes related provisions.
Go to top

S03107 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                          3107
 
                               2025-2026 Regular Sessions
 
                    IN SENATE
 
                                    January 23, 2025
                                       ___________
 
        Introduced  by  Sens.  COONEY, FERNANDEZ, HARCKHAM, JACKSON, MAY, RAMOS,
          S. RYAN, SKOUFIS -- read twice and ordered printed, and  when  printed
          to be committed to the Committee on Education
 
        AN  ACT to amend the education law, in relation to establishing a school
          ventilation and energy efficiency assessment, repair and  verification
          program

          The  People of the State of New York, represented in Senate and Assem-
        bly, do enact as follows:
 
     1    Section 1. Legislative findings and  intent.  The  legislature  hereby
     2  finds and declares that:
     3    a.  The  issue of ameliorating a school's air quality has gotten a lot
     4  of well-deserved attention during the spread of COVID-19  though  venti-
     5  lation  and  also  with  the  increase of extreme heat conditions in the
     6  classrooms.  Cleaner air is better for a  school  building's  population
     7  and  even  helps  with  higher  thinking/cognitive  abilities.  Although
     8  schools are now fully open, a school  with  an  outdated  or  inadequate
     9  heating, ventilation, and air conditioning (HVAC) system, which controls
    10  the  temperature,  humidity, and air quality in school classrooms, leave
    11  many schools susceptible to harmful airborne particles  and,  therefore,
    12  vulnerable to any current or future contagion that plagues the state. It
    13  is important for the state to establish a program which provides for the
    14  safe  ventilation  and  proper  filtration of air throughout each school
    15  building, so they can operate with the confidence that  they  have  safe
    16  and efficient HVAC systems in place.
    17    b.  The  air ventilation and filtration process, essentially, seeks to
    18  bring outside air into the school building and then both condition (heat
    19  or cool) the outside air and remove  any  impure  air  particles  as  it
    20  enters  the  building (as well as recycling the indoor air). To maintain
    21  safety, air particles entering a  school  must  meet  minimum  standards
    22  after  going  through  air  purifiers/filters (e.g., MERV 13 filter) and
 
         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD03182-01-5

        S. 3107                             2
 
     1  qualified testing personnel and engineers can assess and  determine  how
     2  well a filtration system is working and how safe the air is.
     3    c. A program designed to ensure proper school air quality control must
     4  include  professional  assessment, repair and/or replacement of both the
     5  HVAC system, as well as carbon dioxide monitors so that any improvements
     6  to those systems meet the ventilation rates  detailed  in  the  national
     7  Uniform Mechanical Code. Reports generated from the continual monitoring
     8  of  carbon dioxide monitors and maintenance of the HVAC system must also
     9  be made available to the public, electronically.
    10    d. Approximately 41% of school districts across the United  States  of
    11  America  need  HVAC  and  carbon dioxide system improvements, repairs or
    12  updates. Safe air quality levels in public schools protect the health of
    13  students and staff, significantly reduce the risk of infectious airborne
    14  diseases, increase attendance and  improve  student  performance.  Funds
    15  allocated  through  the  U.S.  Department  of Education's Elementary and
    16  Secondary Schools Emergency Relief (ESSER) Programs and  the  Governor's
    17  Emergency  Education Relief (GEER) Programs and the Department of Health
    18  and Humans Services' Head Start and Child Care American Rescue Plan  can
    19  support improvements to ventilation; repairs, upgrades, and replacements
    20  in  Heating,  Ventilation, and Air Conditioning (HVAC) systems; purchase
    21  of MERV 13 air filters, portable air purifiers, and upper-room  germici-
    22  dal  ultraviolet irradiation systems; as well as implementation of other
    23  public health protocols and CDC guidance.
    24    § 2. The education law is amended by adding a  new  section  409-o  to
    25  read as follows:
    26    §  409-o.  School ventilation and energy efficiency assessment, repair
    27  and verification program. 1. For purposes of this section, the following
    28  terms shall have the following meanings:
    29    (a) "ANSI" means American National Standards Institute, or its succes-
    30  sor.
    31    (b) "ASHRAE" means American Society of Heating, Refrigeration and  Air
    32  Conditioning Engineers.
    33    (c) "Certified TAB technician" means a technician certified to perform
    34  testing,  adjusting, and balancing of HVAC systems by the Associated Air
    35  Balance Council (AABC), National Environmental Balancing Bureau  (NEBB),
    36  or  the Testing, Adjusting and Balancing Bureau (TABB), or their succes-
    37  sors.
    38    (d) "HVAC" means heating, ventilation, and air conditioning.
    39    (e) "Mechanical code" means the most recent version of the  Mechanical
    40  Code  of  New  York  State or, for the City of New York, the most recent
    41  version of the New York City Mechanical Code.
    42    (f) "Mechanical engineer" means a professional engineer licensed as  a
    43  mechanical  engineer  by  the state of New York and who has professional
    44  experience with heating, ventilation, and air conditioning systems.
    45    (g) "MERV" means minimum efficiency reporting value, as established by
    46  ASHRAE Standard 52.2-2017 -- Method of Testing General Ventilation  Air-
    47  Cleaning Devices for Removal Efficiency by Particle Size.
    48    (h) "ppm" means parts per million.
    49    (i) "Qualified adjusting personnel" means either of the following:
    50    (i) A certified TAB technician; or
    51    (ii) A skilled and trained workforce under the supervision of a certi-
    52  fied TAB technician.
    53    (j) "Qualified testing personnel" means either of the following:
    54    (i) A certified TAB technician; or
    55    (ii)  A  person  certified to perform ventilation verification assess-
    56  ments of heating, ventilation  and  air  conditioning  systems  from  an

        S. 3107                             3

     1  organization  that has been accredited under the ISO/IEC 17024 Personnel
     2  Certification standard in ventilation verification assessments.
     3    (k)   "Registered  apprenticeship  program"  means  an  apprenticeship
     4  program registered with the department of labor.
     5    (l) "School" shall include but not be limited to  a  school  district,
     6  public  school,  board  of cooperative educational services, special act
     7  school district as defined in section four thousand one of this chapter,
     8  approved preschool special education program pursuant to section  forty-
     9  four  hundred  ten  of  this chapter, schools and programs authorized by
    10  articles eighty-one and eighty-nine  of  this  chapter,  state-supported
    11  schools  in  accordance with article eighty-five of this chapter, or any
    12  public, private or charter primary, secondary education school.
    13    (m) "Skilled and trained workforce" means a workforce where  at  least
    14  sixty percent of the construction workers are graduates of or registered
    15  in  and attending a registered apprenticeship program for the applicable
    16  occupation.
    17    (n) "TAB" means testing, adjusting, and balancing of a HVAC system.
    18    2. Each school shall comply with the procedures set forth in  subdivi-
    19  sions  three, four, five, six and seven of this section for all occupied
    20  buildings  under  the  school's  control.  These  procedures  shall   be
    21  completed  within  twenty-four  months  after the effective date of this
    22  section and at least once every five years thereafter, as  part  of  the
    23  school's  building  condition  survey  required pursuant to section four
    24  hundred nine-d of this article.
    25    3. Each school shall ensure that qualified testing personnel or quali-
    26  fied adjusting personnel performs the following assessments:
    27    (a) Qualified testing  personnel  shall  review  system  capacity  and
    28  airflow  to  determine  the  highest  minimum efficiency reporting value
    29  (MERV) filtration that can  be  installed  without  adversely  impacting
    30  equipment,  shall  replace  or  upgrade  filters where needed, and shall
    31  verify that such filters are installed  correctly.  Recommendations  for
    32  additional  maintenance  in  accordance  with ASHRAE Standard 62.1- 2022
    33  Section 8 and Table 8--1, frequency of filter replacement,  replacement,
    34  or upgrades to allow for more protective filtration shall be recorded in
    35  the  HVAC  Assessment  Report  where filtration meeting or exceeding the
    36  protection of MERV 13 filters cannot be met in the current system.
    37    (b) Qualified testing personnel shall assess the ventilation rates  in
    38  the  facility  classrooms,  auditoriums,  gymnasiums,  nurses'  offices,
    39  kitchen or cafeteria areas,  restrooms,  and  other  occupied  areas  to
    40  determine  whether  they  meet the minimum ventilation rate requirements
    41  set forth in the mechanical code for new construction. Assessment  shall
    42  include, but not be limited to, the following:
    43    (i) Calculation of the estimated minimum outside air ventilation rates
    44  for  each occupied area based on the anticipated maximum occupant densi-
    45  ty, occupancy category, and square  footage  and  the  minimum  required
    46  ventilation  rate  per  occupant. Calculations shall be based on maximum
    47  anticipated classroom or other occupied area occupancy rates and  deter-
    48  mined by the required ventilation rates set forth in the mechanical code
    49  for new construction;
    50    (ii)  Measurement  of  outside  air,  and  verification of whether the
    51  system provides the minimum outside air ventilation rates calculated  in
    52  subparagraph (i) of this paragraph;
    53    (iii)  Verification  of coil velocities and unit discharge air temper-
    54  atures required to maintain desired indoor conditions and to avoid mois-
    55  ture carry over from cooling coils;

        S. 3107                             4
 
     1    (iv) Verification that separation  between  outdoor  air  intakes  and
     2  exhaust discharge outlets meet the requirements of the mechanical code;
     3    (v) Confirmation that the air handling unit is bringing in outdoor air
     4  and removing exhaust air as intended by the system design; and
     5    (vi)  Measurement  of  exhaust  air volume for exhaust fans, including
     6  restrooms, and verification that exhaust air volume meets system  design
     7  and the requirements of the mechanical code.
     8    (c)  For  systems  with economizers, qualified testing personnel shall
     9  test system economizer dampers for proper operation. Economizer  dampers
    10  and  controls  that  are not properly functioning shall be repaired by a
    11  skilled and trained workforce. Recommendations  for  additional  mainte-
    12  nance,  replacement or upgrades shall be recorded in the HVAC assessment
    13  report.
    14    (d) If installed, demand control ventilation systems shall be verified
    15  by qualified testing personnel  for  proper  operation.  Demand  control
    16  ventilation  systems that are not properly functioning shall be repaired
    17  by a skilled and trained workforce. If the  demand  control  ventilation
    18  system is recommended to be disabled or is unable to provide recommended
    19  ventilation  rates, the HVAC system must be configured to meet the mini-
    20  mum ventilation rate requirements without  use  of  the  demand  control
    21  ventilation  and  tested  and adjusted to achieve design minimum outside
    22  air value. Recommendations for additional  maintenance,  replacement  or
    23  upgrades shall be recorded in the HVAC assessment report.
    24    (e) (i) Qualified testing personnel shall: (A) perform survey readings
    25  of  inlets  and outlets to verify all ventilation is reaching the served
    26  zone and that there is adequate distribution; (B) verify if  inlets  and
    27  outlets  are  balanced  within  tolerance  of the system design; and (C)
    28  document read values and deficiencies. If  the  original  system  design
    29  values  are  not  available,  qualified testing personnel shall document
    30  available information and note unavailability of system design values in
    31  the HVAC assessment report.
    32    (ii) Qualified testing personnel shall verify building and space pres-
    33  sure to ensure:
    34    (A) Pressure differential is within tolerance of design, if known.
    35    (B) Building is not over or under pressurized.
    36    (C) If applicable, rooms designated for temporary occupation  by  sick
    37  students  or  staff  shall maintain a negative pressure, or as otherwise
    38  designed.
    39    (f) Qualified testing personnel shall verify coil  condition,  conden-
    40  sate  drainage,  cooling coil air temperature differential (entering and
    41  leaving dry bulb), heat exchanger air temperature differential (entering
    42  and leaving dry bulb), and drive assembly condition. Recommendations for
    43  additional maintenance in accordance with  ASHRAE  Standard  62.1-  2022
    44  Section  8  and Table 8--1, replacement or upgrades shall be recorded in
    45  the HVAC assessment report.
    46    (g) Qualified testing personnel shall review control sequences to:
    47    (i) verify systems will maintain  intended  ventilation,  temperature,
    48  and humidity conditions during school operation; and
    49    (ii)  verify  a daily flush is scheduled per applicable local or state
    50  guidance.
    51    (h) (i) Verification that all classrooms, assembly  areas  and  office
    52  spaces  intended for more than ten permanent occupants are equipped with
    53  a carbon dioxide monitor that:
    54    (A) Is hardwired, plug-in, or battery-operated and mounted to the wall
    55  between three and six feet above the floor and at least five  feet  away
    56  from the door and operable windows;

        S. 3107                             5
 
     1    (B)  Displays  the  carbon  dioxide  readings to the teacher through a
     2  display on the device or other means such as a web-based application  or
     3  cell phone application;
     4    (C)  Notifies  the  teacher  and  other  appropriate  school personnel
     5  through visual indicator on the monitor (e.g., indicator light) or other
     6  alert such as e-mail, text, or cell phone application, when  the  carbon
     7  dioxide levels in the classroom have exceeded 1,100 ppm;
     8    (D)  Maintains  a  record of previous data which includes at least the
     9  maximum carbon dioxide concentration measured;
    10    (E) Has a range of 1-5000 ppm; and
    11    (F) Is certified by the manufacturer to be accurate within 75  ppm  at
    12  1,000  ppm carbon dioxide concentration and is certified by the manufac-
    13  turer to require calibration no more frequently  than  once  every  five
    14  years.
    15    (ii)  The  technical  specifications  for  carbon dioxide monitors set
    16  forth above may be amended by regulation as necessary to reflect  avail-
    17  able technology and to achieve the intent of this subdivision.
    18    (iii)  Classrooms,  assembly  areas,  kitchen  or cafeteria areas, and
    19  office spaces intended for more than ten permanent  occupants  that  are
    20  not  equipped  with  a carbon dioxide monitor meeting the above require-
    21  ments shall be retrofitted to include such a monitor  as  part  of  this
    22  assessment.
    23    (iv)  Where an existing carbon dioxide monitor is more than five years
    24  old, a qualified testing technician shall verify that the carbon dioxide
    25  monitor is accurate within 75 ppm at 1,000 ppm carbon dioxide, and shall
    26  recalibrate or replace the carbon dioxide monitor where needed  to  meet
    27  the required accuracy.
    28    (i)  In  facilities  where  there is limited or no existing mechanical
    29  ventilation, the assessment shall focus on documenting  existing  condi-
    30  tions  and providing the mechanical engineer with the information needed
    31  to provide mechanical ventilation upgrade recommendations if  needed  to
    32  ensure  proper  ventilation  and indoor air quality. Classrooms or other
    33  rooms being occupied within a school with limited or no existing mechan-
    34  ical ventilation shall be required to comply  with  the  requirement  to
    35  install carbon dioxide monitors.
    36    4.  (a) A qualified testing personnel or qualified adjusting personnel
    37  shall prepare an HVAC assessment report for review by a mechanical engi-
    38  neer. The HVAC assessment  report  shall  be  documented  utilizing  the
    39  sample  ventilation  verification test sheets listed in the prerequisite
    40  section, additional guidance, of ASHRAE Technical Committee 9.7,  Educa-
    41  tional Facilities Design Guidance for Education Facilities:  Prioritiza-
    42  tion for Advanced Indoor Air Quality, 2023 publication.
    43    (b)  The  HVAC assessment report shall include, but not be limited to,
    44  the following information:
    45    (i) Name and address of  school  facility  and  person  or  contractor
    46  preparing and certifying the assessment report;
    47    (ii)  Description  of  assessment,  maintenance, adjustment and repair
    48  activities and outcomes;
    49    (iii) Documentation of HVAC equipment  model  number,  serial  number,
    50  general  condition of unit, and any additional information that could be
    51  used to assess  replacement  and  repair  options  given  potential  for
    52  increased energy efficiency benefits;
    53    (iv)  Either  verification  that  filters  that  meet  or  exceed  the
    54  protection of MERV 13 filters have been installed or  verification  that
    55  the  maximum  MERV-rated  filter  that the system is able to effectively
    56  handle has been installed and what that MERV-rating is;

        S. 3107                             6
 
     1    (v) Verification that all requirements of the program have been satis-
     2  fied, including installation of carbon dioxide monitors;
     3    (vi) The verified ventilation rates for facility classrooms, auditori-
     4  ums, kitchen or cafeteria areas, gymnasiums, nurses' offices, restrooms,
     5  offices,  and  other  occupied  areas,  and whether those rates meet the
     6  requirements set forth for new construction in the mechanical code;
     7    (vii) The  verified  exhaust  for  facility  classrooms,  auditoriums,
     8  gymnasiums,  nurses'  offices,  restrooms,  and other occupied areas and
     9  whether those rates meet system  design  and  the  requirements  of  the
    10  mechanical code;
    11    (viii)  Documentation  of  system deficiencies and recommendations for
    12  additional maintenance in accordance with  ASHRAE  Standard  62.1-  2022
    13  Section  8  and  Table  8--1,  replacement or upgrades to improve energy
    14  efficiency, safety, or performance, if any; and
    15    (ix) Verification that  all  work  has  been  performed  by  qualified
    16  personnel,  including  the provision of the contractor's name, qualified
    17  testing personnel or qualified adjusting personnel  name  or  names  and
    18  certification  number or numbers, and verification that all construction
    19  work has been performed by a skilled and trained workforce.
    20    5. (a) A mechanical engineer shall review the HVAC assessment  report,
    21  verify or adjust the estimated minimum outside air ventilation rates and
    22  determine  what,  if  any,  additional adjustments, repairs, upgrades or
    23  replacements would be necessary to  meet  the  minimum  ventilation  and
    24  filtration  requirements and provide a cost estimate for all recommended
    25  work.
    26    (b) If the mechanical engineer's cost estimate for additional  adjust-
    27  ments,  repairs,  upgrades,  or  replacements  necessary to meet minimum
    28  ventilation and filtration requirements  exceeds  two  hundred  thousand
    29  dollars, the mechanical engineer shall also provide a recommendation for
    30  adjustments,  repairs,  upgrades or replacements that would best improve
    31  ventilation and filtration conditions  at  a  cost  not  to  exceed  two
    32  hundred thousand dollars.
    33    6.  (a) All HVAC repairs, upgrades, or replacements shall be performed
    34  by a skilled and  trained  workforce.  All  HVAC  adjustments  shall  be
    35  performed by qualified adjusting personnel.
    36    (b) Adjustments, repairs, upgrades, or replacements recommended by the
    37  mechanical  engineer  shall be completed to the extent the cost does not
    38  to exceed two hundred  thousand  dollars.  If  recommended  adjustments,
    39  repairs,  upgrades,  or replacements exceed two hundred thousand dollars
    40  in costs to ensure classrooms meet minimum  ventilation  and  filtration
    41  requirements,  the school may authorize expenditure of additional avail-
    42  able funds and/or shall seek additional funds, if necessary, to make the
    43  recommended adjustments, repairs, upgrades, or replacements.
    44    7. (a) The school shall prepare an  HVAC  verification  report  within
    45  thirty days of completion of all work pursuant to this section.
    46    (b) The HVAC verification report shall include, but not be limited to,
    47  the following information:
    48    (i) Name and address of school and each building;
    49    (ii) Name of person or contractor preparing and certifying the report;
    50    (iii)  Description  of  assessment,  maintenance,  adjustment, repair,
    51  upgrade, and replacement activities and outcomes;
    52    (iv) Verification that all requirements of this section have been met;
    53    (v) Verification that either filters  meeting  or  exceeding  MERV  13
    54  protection   have  been  installed  or  verification  that  the  maximum
    55  MERV-rated filter that the system is able to effectively handle has been
    56  installed and what that MERV-rating is;

        S. 3107                             7
 
     1    (vi) The verified ventilation rates for facility classrooms,  assembly
     2  areas,  kitchen  or cafeteria areas, offices, restrooms, and other occu-
     3  pied areas and whether those rates meet the requirements set  forth  for
     4  new  construction  in  the  mechanical code. If ventilation rates do not
     5  meet  these requirements, then an explanation for why the current system
     6  is unable to meet those rates shall be provided;
     7    (vii) The  verified  exhaust  for  facility  classrooms,  auditoriums,
     8  gymnasiums,  nurses' offices, kitchen or cafeteria areas, restrooms, and
     9  other occupied areas and whether those rates meet system design and  the
    10  requirements of the mechanical code;
    11    (viii)  Documentation  of  repairs, upgrades or replacements performed
    12  pursuant to the HVAC assessment report and mechanical engineer recommen-
    13  dations, including all work performed;
    14    (ix) Documentation of recommendations for  additional  maintenance  in
    15  accordance  with  ASHRAE  Standard  62.1- 2022 Section 8 and Table 8--1,
    16  repairs, replacement, or upgrades to improve energy efficiency,  safety,
    17  or performance;
    18    (x) Documentation of initial operating verifications, adjustments, and
    19  final  operating  verifications, and document any adjustments or repairs
    20  performed;
    21    (xi) Verification of installation of carbon dioxide monitors,  includ-
    22  ing the number verified and installed, make, and model of monitors; and
    23    (xii)  Verification  that  all  work  has  been performed by qualified
    24  personnel, including the provision of the contractor's  name,  qualified
    25  testing  personnel  or  qualified  adjusting personnel name or names and
    26  certification number or numbers, and verification that all  construction
    27  work has been performed by a skilled and trained workforce.
    28    (c)  The  school shall maintain a copy of the HVAC verification report
    29  for a minimum of five years and make it available to any member  of  the
    30  public, electronically, upon request.
    31    8.  (a) At least once every five years following initial inspection in
    32  accordance with ASHRAE Standard 62.1- 2022 Section 8 and Table  8--1,  a
    33  qualified  testing  personnel shall perform the assessment, maintenance,
    34  adjustment, controls, carbon dioxide monitoring and verification  pursu-
    35  ant to subdivisions three, four, five, six and seven of this section.
    36    (b)  Upon  conclusion  of  the  periodic inspection, qualified testing
    37  personnel who performed  the  periodic  inspection  shall  offer  onsite
    38  training   with   appropriate  school  staff  on  the  findings  of  the
    39  inspection.   The training shall include  equipment  identification  and
    40  operations,  safety  protocols,  review of periodic inspection findings,
    41  and preventative maintenance recommendations. School HVAC system techni-
    42  cians or similarly titled school staff or staff who  volunteered  to  be
    43  trained and certified in HVAC maintenance, and who are under any collec-
    44  tive bargaining agreement, are required to create a preventative mainte-
    45  nance  plan  in  accordance  with ASHRAE 180 and ASHRAE 62.1, chapter 8.
    46  Qualified adjusting personnel shall perform adjustments and measurements
    47  within the preventative maintenance plan. Nothing in this section  shall
    48  be  deemed  to  supersede  or diminish the terms, rights, privileges, or
    49  remedies of any employee under any collective  bargaining  agreement  or
    50  employment contract.
    51    (c) (i) If a classroom, auditorium, gymnasium, nurses' office, kitchen
    52  or  cafeteria  areas, restroom, office, and other occupied area's carbon
    53  dioxide concentration alarm set point is exceeded for more than  fifteen
    54  minutes  more  than  four  times  in a month, the classroom, auditorium,
    55  gymnasium, nurses' office, kitchen or cafeteria areas, restroom, office,
    56  and other occupied area's ventilation  rates  shall  be  adjusted  or  a

        S. 3107                             8
 
     1  direct  outside  airflow  measurement  device installed and its accuracy
     2  verified, to ensure peak carbon dioxide concentrations in the classroom,
     3  auditorium, gymnasium, nurses' office, kitchen or cafeteria areas, rest-
     4  room,  office,  and  other  occupied  area  remains below the set point.
     5  Adjustments shall be  performed  by  qualified  adjusting  personnel  as
     6  defined in paragraph (i) of subdivision one of this section.
     7    (ii)  Each  school  shall  record  incidents  where  the set point was
     8  exceeded for more than fifteen minutes more than four times in a  month.
     9  Five years of such records shall be kept for each classroom, auditorium,
    10  gymnasium, nurses' office, kitchen or cafeteria areas, restroom, office,
    11  and  other  occupied area and made available to the public at least on a
    12  quarterly basis.
    13    9. The commissioner shall promulgate rules and regulations as  may  be
    14  necessary and appropriate to implement the provisions of this section.
    15    § 3. Severability. If any provision of this act, or any application of
    16  any  provision of this act, is held to be invalid, that shall not affect
    17  the validity or effectiveness of any other provision of this act, or  of
    18  any  other  application of any provision of this act, which can be given
    19  effect without that provision or  application;  and  to  that  end,  the
    20  provisions and applications of this act are severable.
    21    § 4. This act shall take effect immediately.
Go to top