•  Summary 
  •  
  •  Actions 
  •  
  •  Committee Votes 
  •  
  •  Floor Votes 
  •  
  •  Memo 
  •  
  •  Text 
  •  
  •  LFIN 
  •  
  •  Chamber Video/Transcript 

S04191 Summary:

BILL NOS04191
 
SAME ASSAME AS A06727
 
SPONSORGOUNARDES
 
COSPNSRCOMRIE, FAHY
 
MLTSPNSR
 
Add §11-111, Energy L
 
Requires distribution centers which are 50,000 sq. ft. or more to be equipped with electric vehicle charging stations as determined by the secretary of state and NYSERDA.
Go to top

S04191 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                          4191
 
                               2025-2026 Regular Sessions
 
                    IN SENATE
 
                                    February 3, 2025
                                       ___________
 
        Introduced by Sens. GOUNARDES, COMRIE -- read twice and ordered printed,
          and  when printed to be committed to the Committee on Energy and Tele-
          communications
 
        AN ACT to amend the energy law, in relation  to  code  requirements  for
          heavy distribution centers
 
          The  People of the State of New York, represented in Senate and Assem-
        bly, do enact as follows:
 
     1    Section 1. The energy law is amended by adding a new section 11-111 to
     2  read as follows:
     3    § 11-111. Special code requirements for heavy distribution centers. 1.
     4  Definitions. As used in this section, the following terms shall have the
     5  following meanings:
     6    (a) "Electric vehicle charging station"  shall  mean  a  station  that
     7  delivers  electricity from a source outside an electric vehicle into one
     8  or more electric vehicles. An  electric  vehicle  charging  station  may
     9  include several charge points simultaneously connecting several electric
    10  vehicles  to  the station and any related equipment needed to facilitate
    11  charging plug-in electric vehicles.
    12    (b) "Heavy  distribution  center"  shall  mean  a  facility  that  (i)
    13  contains  at  least fifty thousand square feet of total floor space that
    14  is used for warehouse activities; and (ii) has as  its  primary  purpose
    15  the  temporary  storage, sorting, and redistribution of goods to fulfill
    16  e-commerce orders by receiving shipments  of  goods  from  one  mode  of
    17  transport  and  redistributing  those  goods  via  a delivery vehicle. A
    18  "heavy distribution center" shall not include any facility  where  goods
    19  are  manufactured  or  assembled on site and temporarily stored prior to
    20  distribution, or any facility that has as its primary purpose the tempo-
    21  rary storage of food products for wholesale distribution.
    22    (c) "Last mile delivery"  shall  refer  to  the  final  portion  of  a
    23  parcel's  journey from a heavy distribution center to a consumer or end-
    24  user.
 
         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD06569-02-5

        S. 4191                             2
 
     1    (d) "Person"  means  an  individual,  partnership,  limited  liability
     2  company, society, association, joint stock company, corporation, estate,
     3  receiver,  trustee,  assignee,  referee  or any other person acting in a
     4  fiduciary or representative capacity, whether appointed by  a  court  or
     5  otherwise, any combination of individuals and any other form of unincor-
     6  porated enterprise owned or conducted by two or more persons.
     7    (e)  "Warehouse  operator" shall mean any person that conducts day-to-
     8  day operations at a  heavy  distribution  center,  including  operations
     9  conducted through the use of third-party contractors.
    10    2.  Electric  vehicle charging stations in heavy distribution centers.
    11  (a) All heavy distribution centers subject to the state energy conserva-
    12  tion construction code as described in paragraph (b) of subdivision  one
    13  of  section 11-103 of this article shall be equipped with electric vehi-
    14  cle charging stations on and after the effective date of this section.
    15    (b) The secretary of state, in consultation with the president of  the
    16  New   York  state  energy  research  and  development  authority,  shall
    17  prescribe the required number or numbers of  electric  vehicle  charging
    18  stations  per  heavy distribution center in the code in a manner propor-
    19  tional to the size and needs of such warehouses.
    20    3. Any warehouse operator found in violation of the provisions of this
    21  section shall be liable for the penalties prescribed in  section  11-108
    22  of this article.
    23    § 2. This act shall take effect on the one hundred eightieth day after
    24  it  shall have become a law. Effective immediately, the addition, amend-
    25  ment and/or repeal of any rule or regulation necessary for the implemen-
    26  tation of this act on its effective date are authorized to be  made  and
    27  completed on or before such effective date.
Go to top