S08712 Summary:

BILL NOS08712
 
SAME ASNo Same As
 
SPONSORHINCHEY
 
COSPNSR
 
MLTSPNSR
 
Amd §§137 & 138, add §149, Pub Serv L
 
Requires the office of renewable energy siting and electric transmission to establish and/or amend rules and regulations pertaining to standards related to the siting, design, construction and operation of major renewable energy facilities; requires such rules and regulations to include information relating to certain definitions, preapplication procedures, application procedures, farmland conservation fees, and farmland protection; provides for the repeal of such provisions upon expiration thereof.
Go to top

S08712 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                          8712
 
                    IN SENATE
 
                                     January 7, 2026
                                       ___________
 
        Introduced  by  Sen. HINCHEY -- read twice and ordered printed, and when
          printed to be committed to the Committee on  Energy  and  Telecommuni-
          cations
 
        AN  ACT  to  amend  the  public  service law, in relation to the siting,
          design, construction and operation of major renewable  energy  facili-
          ties  and  to  applications  therefor; and providing for the repeal of
          certain provisions upon expiration thereof
 
          The People of the State of New York, represented in Senate and  Assem-
        bly, do enact as follows:
 
     1    Section  1. Section 137 of the public service law is amended by adding
     2  two new subdivisions 14 and 15 to read as follows:
     3    14. "Agrivoltaics" shall mean the simultaneous use of  areas  of  land
     4  for both solar power generation and agriculture through a ground-mounted
     5  photovoltaic solar energy system constructed, installed, and operated to
     6  achieve  integrated and simultaneous production of both solar energy and
     7  marketable agricultural  products  and  activities  by  an  agricultural
     8  producer, provided that such use:
     9    (a)  is constructed, installed, and operated to achieve integrated and
    10  simultaneous production of both solar energy and marketable agricultural
    11  products consistent with commercial agricultural production, as soon  as
    12  agronomically  feasible  and  continuing  until decommissioning, on land
    13  beneath or between rows of solar panels;
    14    (b) has been intentionally  planned  and  designed  with  agricultural
    15  producers or experts;
    16    (c)  has provisions for decommissioning to protect the land's agricul-
    17  tural resources and utility; and
    18    (d) does not significantly displace farming activity.
    19    15. "Agricultural products and activities"  shall  include:  (a)  crop
    20  production;  (b)  animal  husbandry; and (c) livestock grazing or cattle
    21  grazing; provided, however, that agricultural  products  and  activities
    22  shall  not  include  sheep  grazing  as the sole farming activity except
    23  where the land utilized  is  currently  utilized  exclusively  for  such
    24  purpose;  and  provided further, however, that agricultural products and
 
         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD14269-02-5

        S. 8712                             2
 
     1  activities shall not include pollinator habitats, apiaries, or  both  as
     2  the sole farming activities.
     3    § 2. Subdivision 1 of section 138 of the public service law is amended
     4  by adding a new paragraph (d) to read as follows:
     5    (d)  In  its review of applications for permits pursuant to this arti-
     6  cle, ORES shall give priority to previously developed sites and existing
     7  or abandoned commercial sites, including without limitation brownfields,
     8  landfills, former  commercial  or  industrial  sites,  dormant  electric
     9  generating  sites,  parking lots as defined in section one hundred twen-
    10  ty-nine-b of the vehicle and traffic law, warehouse distribution centers
    11  as defined in section seven hundred eighty of the labor law, correction-
    12  al facilities as defined in article one of the corrections  law,  retail
    13  establishments  of  greater than twenty-five thousand square feet, road-
    14  side rest areas pursuant to section  twenty  of  the  highway  law,  and
    15  otherwise underutilized sites.
    16    §  3. Subdivision 4 of section 138 of the public service law, as added
    17  by section 11 of part O of chapter 58 of the laws of 2024, is amended to
    18  read as follows:
    19    4. The uniform standards and conditions established pursuant  to  this
    20  section shall be designed to avoid, minimize, or mitigate to the maximum
    21  extent  practicable,  potential significant adverse impacts to land used
    22  in agricultural production, with additional consideration for land with-
    23  in an agricultural district or land that contains  mineral  soil  groups
    24  [1-4] 1-7. In its review of an application for a permit pursuant to this
    25  article,  ORES,  in  consultation with the department of agriculture and
    26  markets, shall ensure that a critical mass of farmland within the desig-
    27  nated region is not threatened and ensure that solar  development  shall
    28  not  greatly  hinder the amount of farmland within New York state and/or
    29  be a potential threat to the state's food security. Two years after  the
    30  effective  date  of  the  chapter of the laws of two thousand twenty-six
    31  that amended this subdivision,  the  office,  in  conjunction  with  the
    32  public service commission and the department of agriculture and markets,
    33  shall  reevaluate the efficacy of this subdivision and propose recommen-
    34  dations to the legislature, including but not limited to, the  consider-
    35  ation of new pertinent technology and/or information.  The provisions of
    36  this subdivision shall not apply in the consideration of any permits for
    37  siting,  design,  construction, or operation of a major renewable energy
    38  facility for which a completed application  has  been  received  by  the
    39  office  of  renewable  energy siting and electric transmissions prior to
    40  the adoption of amended uniform standards and conditions consistent with
    41  this subdivision.
    42    § 4. The public service law is amended by adding a new section 149  to
    43  read as follows:
    44    §  149. Rules and regulations. ORES shall establish and/or amend rules
    45  and regulations pertaining to the  standards  related  to  siting  major
    46  renewable energy facilities to include the following:
    47    1.  the  definition of prime farmland as defined in part 622.04 of the
    48  USDA handbook and the definitions of unique farmland,  specific  charac-
    49  teristics  of  unique  farmland, additional farmland of statewide impor-
    50  tance, and additional farmland of local importance  as  such  terms  are
    51  defined in 7 CFR § 657.5.
    52    2. preapplication procedures which require applicants to:
    53    (a) submit a report delineating the impacts to prime agricultural land
    54  and  prime  soils,  unique  farmland and farmland of statewide and local
    55  importance, including mineral soil groups 1-7 as defined by the  depart-
    56  ment of agriculture and markets;

        S. 8712                             3
 
     1    (b) submit a cumulative impact study as to how the use of farmland for
     2  solar  siting will impact the regional food economy and regional overall
     3  farmland protection plan;
     4    (c)  ensure  that  a  critical  mass of farmland within the designated
     5  region is not threatened. Two years after the  effective  date  of  this
     6  section,  the  office, in conjunction with the public service commission
     7  and the department of agriculture  and  markets,  shall  reevaluate  the
     8  efficacy of this subdivision and propose recommendations to the legisla-
     9  ture,  including  but not limited to, the consideration of new pertinent
    10  technology and/or information; and
    11    (d) submit an affidavit of  financial  solvency,  including  financial
    12  statements.
    13    3.  application  procedures for major renewable energy facility siting
    14  permits. Such procedures shall require that each  application  for  such
    15  permits include:
    16    (a)  the  submission of a cumulative impact statement within the study
    17  area which includes the following criteria:
    18    (i) categories based on solar array size, specifying the array capaci-
    19  ty and how much power  or  electricity  is  expected  to  be  generated,
    20  on-site or associated electric load, and the land use footprint, includ-
    21  ing the acreage of land underlying the array;
    22    (ii)  customer  type  by  identifying the end-use entity consuming the
    23  electricity or receiving the electric credits generated by  the  project
    24  and  how  such end-user is classified in utilities' established electric
    25  rate structures for different customer classes,  including  residential,
    26  commercial, industrial, agricultural or low-income;
    27    (iii)  categories  based  on  solar array location, specifying whether
    28  solar arrays are roof-mounted, and designating preferred sites for solar
    29  development and ineligible sites; and
    30    (iv) categories based on  solar  array  design,  including  specifying
    31  whether such solar array utilizes dual use or agrivoltaics; and
    32    (b)  for  major  renewable  energy  facilities sited on prime soils or
    33  farmlands, the submission by the applicant of decommissioning plans  for
    34  arrays  on  agricultural  land and decommissioning bonds for commercial-
    35  scale projects. Such application procedures shall require the  applicant
    36  to:
    37    (i) include a decommissioning plan in the application;
    38    (ii)  show substantial evidence that all structures and materials will
    39  be removed upon decommissioning of such facility and ensure  that  soils
    40  will be capable of agricultural production; and
    41    (iii)  obtain a form of insurance, including but not limited to decom-
    42  missioning surety bonds, to secure all  or  a  part  of  decommissioning
    43  costs  required  at the conclusion of the lease and submit proof of such
    44  insurance to ORES.
    45    4. the submission of a farmland conservation fee of one percent of the
    46  price per acre of prime soil or prime farmland on which solar is  devel-
    47  oped.  Such farmland conservation fee shall be deposited in the agricul-
    48  tural and farmland viability protection  fund  established  pursuant  to
    49  section ninety-nine-pp of the state finance law; provided, however, that
    50  if  the  project  is an agrivoltaics project, the applicant shall not be
    51  required to submit the farmland conservation fee.
    52    5. farmland protection. Such rules and regulations shall require  ORES
    53  to  consider  the  regional  impacts,  based on the economic development
    54  council region pursuant to section two hundred thirty  of  the  economic
    55  development law, on farmland preservation, local food supply chains, and
    56  statewide food security; provided, however, that the office shall ensure

        S. 8712                             4
 
     1  that  a  critical  mass  of farmland within the designated region is not
     2  threatened.  Two years after the effective date  of  this  section,  the
     3  office,  in  conjunction  with  the  public  service  commission and the
     4  department  of agriculture and markets, shall reevaluate the efficacy of
     5  this subdivision and propose recommendations to the legislature, includ-
     6  ing but not limited to, the consideration of  new  pertinent  technology
     7  and/or information.
     8    §  5.  This act shall take effect immediately; provided, however, that
     9  the amendments to article 8 of the public service law made  by  sections
    10  one, two, three and four of this act shall not affect the repeal of such
    11  article and shall be deemed repealed therewith.