•  Summary 
  •  
  •  Actions 
  •  
  •  Committee Votes 
  •  
  •  Floor Votes 
  •  
  •  Memo 
  •  
  •  Text 
  •  
  •  LFIN 
  •  
  •  Chamber Video/Transcript 

S08764 Summary:

BILL NOS08764
 
SAME ASSAME AS A09441
 
SPONSORHINCHEY
 
COSPNSR
 
MLTSPNSR
 
Amd §66, Pub Serv L (as proposed in S.8213 & A.2736-A)
 
Requires that any proposed capital expenditure to be considered in any matter affecting a major change in rates must be described by the utility on a per project basis and shall include the purpose and the need for each capital expenditure, total cost, and benefits to the ratepayers and the operation of the distribution system, and shall be posted on the PSC website.
Go to top

S08764 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                          8764
 
                    IN SENATE
 
                                     January 8, 2026
                                       ___________
 
        Introduced  by  Sen. HINCHEY -- read twice and ordered printed, and when
          printed to be committed to the Committee on Rules
 
        AN ACT to amend the public service law, in relation to consideration  of
          capital expenditures by a utility proposing a major change in rates
 
          The  People of the State of New York, represented in Senate and Assem-
        bly, do enact as follows:

     1    Section 1. Paragraph (m) of subdivision 12 of section 66 of the public
     2  service law, as added by a chapter of the  laws  of  2025  amending  the
     3  public  service law relating to consideration of capital expenditures in
     4  utility rate proceedings, as proposed in legislative  bills  numbers  S.
     5  8213 and A. 2736-A, is amended to read as follows:
     6    (m)  [Any]  As a separate and distinct part of any filing by a utility
     7  proposing  a  major  change  in  rates,  the  utility  must  provide   a
     8  description of any proposed capital expenditure [to be considered in any
     9  matter  affecting a major change in rates must be described, which shall
    10  include], on a per project basis, including but  not  [be]  limited  to,
    11  the:    (i)  purpose  of and the need for each of the proposed [project]
    12  capital expenditures, (ii) total cost, (iii) expected period of  useful-
    13  ness,  (iv)  location in the service territory, (v) rationale for inclu-
    14  sion in the proceeding, and (vi) anticipated  benefits  to  ratepayers[,
    15  measured  by  lower  costs to ratepayers and/or other benefits as deter-
    16  mined by the commission] and the operation of the  distribution  system.
    17  Such  descriptions  of [projects] capital expenditures, on a per project
    18  basis, shall be posted on the commission's website.  Pursuant  to  para-
    19  graph (i) of this subdivision, the burden of proof to show that a change
    20  in  rates  related  to  each  capital expenditure is just and reasonable
    21  shall be on the utility.
    22    § 2. Nothing in this act shall be construed to limit or  restrict  the
    23  existing powers of the public service commission.
    24    §  3.  This  act  shall  take  effect on the same date and in the same
    25  manner as a chapter of the laws of 2025 amending the public service  law
    26  relating  to  consideration  of  capital  expenditures  in  utility rate
    27  proceedings, as proposed in legislative bills numbers  S.  8213  and  A.
    28  2736-A, takes effect.
 
         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD05485-04-6
Go to top