S00098 Summary:

BILL NOS00098
 
SAME ASSAME AS A00491
 
SPONSORCOMRIE
 
COSPNSR
 
MLTSPNSR
 
Add §66-x, Pub Serv L
 
Requires electric corporations build make-ready infrastructure to facilitate the charging of electric vehicles.
Go to top

S00098 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                           98
 
                               2025-2026 Regular Sessions
 
                    IN SENATE
 
                                       (Prefiled)
 
                                     January 8, 2025
                                       ___________
 
        Introduced  by  Sen.  COMRIE -- read twice and ordered printed, and when
          printed to be committed to the Committee on  Energy  and  Telecommuni-
          cations
 
        AN  ACT  to  amend the public service law, in relation to building make-
          ready electrical infrastructure for the charging of electric vehicles

          The People of the State of New York, represented in Senate and  Assem-
        bly, do enact as follows:
 
     1    Section  1.  The public service law is amended by adding a new section
     2  66-x to read as follows:
     3    § 66-x. Make-ready electrical infrastructure.  1.  Legislative  intent
     4  and  purpose.  It is the intent and purpose of this section to implement
     5  cost effective and unified treatment by electric corporations  of  elec-
     6  trical  distribution  infrastructure,  and  certain customer-owned make-
     7  ready infrastructure, needed to charge electric  vehicles;  and  provide
     8  for  certain  costs  of  such  infrastructure to be included in electric
     9  corporations' rate  bases  and  generally  recovered  through  rates  or
    10  surcharges,  instead  of  directly  from  the  customers  served by such
    11  infrastructure. Nothing in this section shall modify any  obligation  of
    12  an  electric  corporation  to  provide a full and accurate accounting of
    13  costs related to electrical distribution infrastructure needed to charge
    14  electric vehicles.
    15    2. Definitions. For the purposes of this section the  following  terms
    16  shall have the following meanings:
    17    (a) "Electrical distribution infrastructure" means any utility facili-
    18  ties  used  to  distribute  electric  service to customers, and includes
    19  poles, vaults, service drops, transformers,  mounting  pads,  trenching,
    20  conduit,  wire, cable, meters, other equipment as necessary, and associ-
    21  ated engineering and civil construction work.
    22    (b) "Utility-owned make-ready costs" means any capital  investment  in
    23  electrical distribution infrastructure needed to connect and serve a new
 
         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD00265-01-5

        S. 98                               2
 
     1  electric  vehicle  charger,  including  step down transformers, overhead
     2  service lines, and utility meters.
     3    (c)  "Customer-owned make-ready costs" means any capital investment in
     4  equipment or infrastructure beyond the utility service  point  necessary
     5  to make a site, other than a single-family residence, ready to accept an
     6  electric vehicle charger, including conductors, trenching, and panels.
     7    (d) "Disadvantaged community" means a community defined as a disadvan-
     8  taged  community under article seventy-five of the environmental conser-
     9  vation law.
    10    (e) "Public serving fleet" means a fleet of vehicles owned, leased, or
    11  contracted by the state, any municipality, public  authority  or  school
    12  district that owns, leases, or contracts more than twenty-five vehicles.
    13    3.  Reasonable  efforts  required.  Electric  corporations  shall make
    14  reasonable efforts to ensure that any infrastructure built  pursuant  to
    15  this  section  is  efficiently  sized  and  operated.  Such  efforts may
    16  include, but not be limited to, considering customers' reasonably  fore-
    17  seeable load management activities and deployments of distributed energy
    18  resources.
    19    4.  Application.  No later than sixty days after the effective date of
    20  this section, all electric corporations shall file an  application  with
    21  the  commission to establish a tariff that shall replace the line exten-
    22  sion rules currently used by such electric corporations. Such tariff, at
    23  a minimum, shall:
    24    (a) provide for such  electric  corporation  to  deploy  customer-side
    25  make-ready infrastructure;
    26    (b)  authorize  such  electric corporation to include in its base rate
    27  one hundred percent of all reasonable and  prudent  utility-owned  make-
    28  ready costs;
    29    (c)  authorize such electronic corporation to include in its base rate
    30  of reasonable and  prudent  customer-side  make-ready  costs  needed  to
    31  prepare a site for electric vehicle charging in the following manner:
    32    (i)  a minimum fifty percent or higher where authorized by the commis-
    33  sion, of customer-owned make-ready costs in locations that are not with-
    34  in two miles of a disadvantaged community zone;
    35    (ii) one hundred percent of customer-owned  make-ready  costs  located
    36  within a disadvantaged community or disadvantaged community zone;
    37    (iii)  one  hundred  percent  of  customer-owned  make-ready costs for
    38  public serving fleets; and
    39    (d) provide  that  the  portion  of  customer-owned  make-ready  costs
    40  included  in  the  electric corporation's rate base shall not be charged
    41  directly or solely to the customer served by such make-ready infrastruc-
    42  ture.
    43    5. Disadvantaged community zone. For the purposes of this section  the
    44  commission shall define the term "disadvantaged community zone".
    45    6. Cost treatment and recovery for utility-owned make-ready costs. All
    46  electric  corporations  shall  maintain  budgets  for its costs incurred
    47  under this section.  The  portion  of  customer-owned  make-ready  costs
    48  incurred by an electric corporation pursuant to subdivision four of this
    49  section  shall  be  treated in accordance with a depreciation or amorti-
    50  zation schedule as authorized by the  commission.  Any  electric  corpo-
    51  ration  may  recover  the revenue requirement associated with such costs
    52  through a surcharge mechanism until its base rates are reset. Any  elec-
    53  tric corporation seeking to recover such costs through a surcharge mech-
    54  anism  shall  include  such  proposal  as  part of its application filed
    55  pursuant to subdivision four of this section.

        S. 98                               3
 
     1    7. Approval of tariffs. The commission shall, after notice and  oppor-
     2  tunity  for  public  comment and within ninety days of the filing of the
     3  tariff, approve, or modify and approve, such tariff.
     4    § 2. This act shall take effect immediately.