A06340 Summary:

BILL NOA06340
 
SAME ASSAME AS S02585-B
 
SPONSORBarrett
 
COSPNSRSeawright, McDonald
 
MLTSPNSR
 
Add §§66-v & 66-w, Pub Serv L
 
Establishes a program for eligible zero emissions energy systems to promote private sector investment for the purpose of meeting the target that by the year two thousand forty the statewide electrical demand system will be zero emissions.
Go to top    

A06340 Actions:

BILL NOA06340
 
04/05/2023referred to energy
01/03/2024referred to energy
Go to top

A06340 Committee Votes:

Go to top

A06340 Floor Votes:

There are no votes for this bill in this legislative session.
Go to top

A06340 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                          6340
 
                               2023-2024 Regular Sessions
 
                   IN ASSEMBLY
 
                                      April 5, 2023
                                       ___________
 
        Introduced  by M. of A. BARRETT -- read once and referred to the Commit-
          tee on Energy
 
        AN ACT to amend the public service law, in relation  to  establishing  a
          program for eligible zero emissions energy systems
 
          The  People of the State of New York, represented in Senate and Assem-
        bly, do enact as follows:

     1    Section 1. The public service law is amended by adding a  new  section
     2  66-v to read as follows:
     3    §  66-v.  Establishment of a zero emissions energy systems program. 1.
     4  As used in this section:
     5    (a) "zero emissions energy systems" means systems, other than  renewa-
     6  ble  energy systems, that generate electricity or thermal energy through
     7  the use of technologies that do not lead to a net increase in greenhouse
     8  gas emissions into the atmosphere at any time in the process of generat-
     9  ing electricity;
    10    (b) "renewable energy systems" shall  have  the  meaning  provided  in
    11  section sixty-six-p of this article; and
    12    (c)  "greenhouse  gas"  shall  have  the  meaning  provided in section
    13  75-0101 of the environmental conservation law.
    14    2. No later than one year from the effective date of this section, the
    15  commission shall establish a  competitive  program  to  promote  private
    16  sector  investment in a minimum of one gigawatt of installed capacity of
    17  zero emissions energy systems that use eligible  technologies  that  the
    18  commission  has  determined, after notice and provision for the opportu-
    19  nity to comment, are operationally capable  by  the  year  two  thousand
    20  thirty  of  providing the operating flexibility and longer-term perform-
    21  ance that the electric grid system will require.  The commission  shall:
    22  (a)  establish a competitive program, after notice and provision for the
    23  opportunity to comment, for the purpose of  meeting  the  target  estab-
    24  lished  pursuant to section sixty-six-p of this article that by the year
    25  two thousand forty the statewide electrical demand system will  be  zero
 
         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD06266-04-3

        A. 6340                             2
 
     1  emissions;  (b) commence the implementation of the program no later than
     2  two years from the effective date of this section; and (c) require  that
     3  zero  emissions energy systems subject to the provisions of this section
     4  shall commence commercial operation by the year two thousand thirty.
     5    3.  The commission may temporarily modify the obligations under such a
     6  program upon its finding that the program: impedes the provision of safe
     7  and adequate electric services; is  likely  to  impair  obligations  and
     8  agreements;  and/or  results  in  a  significant  increase in arrears or
     9  service disconnections that the commission determines are related to the
    10  program.
    11    4. No later than three years from the effective date of  this  section
    12  and  every two years thereafter, or upon modification of the obligations
    13  under the program, the commission shall conduct a  comprehensive  review
    14  and  issue a written assessment of the program to determine, among other
    15  matters, progress in meeting the target for the deployment of zero emis-
    16  sions energy systems.
    17    § 2. The public service law is amended by adding a new section 66-w to
    18  read as follows:
    19    § 66-w. Requirements for zero emissions energy  systems.  1.  For  the
    20  purposes of this section, "zero emissions energy systems" shall have the
    21  same  meaning  as  in paragraph (a) of subdivision one of section sixty-
    22  six-v of this article and as determined by the  commission  pursuant  to
    23  subdivision two of section sixty-six-v of this article.
    24    2.  As  part of the competitive program the commission establishes and
    25  implements pursuant to section sixty-six-v of this article, the owner of
    26  the zero emissions energy system, or a third party acting on the owner's
    27  behalf, as an ongoing condition of any agreement with  a  public  entity
    28  that  implements  the provisions of section sixty-six-v of this article,
    29  shall comply with the provisions of section sixty-six-r of this  article
    30  and section two hundred twenty-four-d of the labor law.
    31    § 3. This act shall take effect immediately.