S01382 Summary:

BILL NOS01382
 
SAME ASSAME AS A06394
 
SPONSORCOMRIE
 
COSPNSRRAMOS
 
MLTSPNSR
 
Amd §§1266 & 1209, Pub Auth L
 
Requires the metropolitan transportation authority and the New York city transit authority to implement certain standards issued by the society for protective coatings pertaining to applying and removing coatings from bridges, trestles, and elevated subway and railway tracks and stations.
Go to top    

S01382 Actions:

BILL NOS01382
 
01/11/2023REFERRED TO TRANSPORTATION
01/03/2024REFERRED TO TRANSPORTATION
04/08/20241ST REPORT CAL.772
04/09/20242ND REPORT CAL.
04/11/2024ADVANCED TO THIRD READING
05/14/2024PASSED SENATE
05/14/2024DELIVERED TO ASSEMBLY
05/14/2024referred to corporations, authorities and commissions
Go to top

S01382 Committee Votes:

Go to top

S01382 Floor Votes:

There are no votes for this bill in this legislative session.
Go to top

S01382 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                          1382
 
                               2023-2024 Regular Sessions
 
                    IN SENATE
 
                                    January 11, 2023
                                       ___________
 
        Introduced by Sens. COMRIE, RAMOS -- read twice and ordered printed, and
          when printed to be committed to the Committee on Transportation
 
        AN ACT to amend the public authorities law, in relation to requiring the
          metropolitan  transportation  authority  and the New York city transit
          authority to implement certain standards pertaining  to  applying  and
          removing  coatings from bridges, trestles, elevated subway and railway
          tracks and stations
 
          The People of the State of New York, represented in Senate and  Assem-
        bly, do enact as follows:
 
     1    Section  1.  Section  1266 of the public authorities law is amended by
     2  adding a new subdivision 20 to read as follows:
     3    20. The authority shall promulgate regulations  to  require  that  all
     4  application  and maintenance of paint and coatings on bridges, trestles,
     5  elevated subway  tracks,  elevated  subway  stations,  elevated  railway
     6  tracks  and  elevated railway stations performed by non-employees of the
     7  authority have a quality management program and meet applicable industry
     8  standards of the society for  protective  coatings  painting  contractor
     9  certification program to standards QP-1, QP-2, QP-3, or national associ-
    10  ation  of  corrosion  engineers NIICAP AS1 and AS2. The removal, surface
    11  preparation, and application of all  paint  and  coatings  on  authority
    12  property,  facilities and assets shall be performed by certified workers
    13  in accordance with the NACE 13/ACS1 Standard.
    14    § 2. Section 1209 of the public authorities law is amended by adding a
    15  new subdivision 16 to read as follows:
    16    16. The authority shall promulgate regulations  to  require  that  all
    17  application  and maintenance of paint and coatings on bridges, trestles,
    18  elevated subway  tracks,  elevated  subway  stations,  elevated  railway
    19  tracks  and  elevated railway stations performed by non-employees of the
    20  authority have a quality management program and meet applicable industry
    21  standards of the society for  protective  coatings  painting  contractor
    22  certification program to standards QP-1, QP-2, QP-3, or national associ-
 
         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD03395-01-3

        S. 1382                             2
 
     1  ation  of  corrosion  engineers NIICAP AS1 and AS2. The removal, surface
     2  preparation, and application of all  paint  and  coatings  on  authority
     3  property,  facilities and assets shall be performed by certified workers
     4  in accordance with the NACE 13/ACS1 Standard.
     5    §  3.  This  act  shall take effect immediately and shall apply to all
     6  projects and bids proposed on or after such date and to any contract for
     7  which bids or proposals are submitted after such date.
Go to top