S03505 Summary:

BILL NOS03505A
 
SAME ASNo Same As
 
SPONSORYOUNG
 
COSPNSR
 
MLTSPNSR
 
 
Authorizes the department of environmental conservation to grant an easement through the Boutwell Hill state forest for electric generation facilities associated with a wind powered electric generation project.
Go to top    

S03505 Actions:

BILL NOS03505A
 
02/11/2015REFERRED TO ENVIRONMENTAL CONSERVATION
05/05/20151ST REPORT CAL.538
05/06/20152ND REPORT CAL.
05/11/2015ADVANCED TO THIRD READING
06/11/2015AMENDED ON THIRD READING 3505A
06/16/2015PASSED SENATE
06/16/2015DELIVERED TO ASSEMBLY
06/16/2015referred to environmental conservation
01/06/2016died in assembly
01/06/2016returned to senate
01/06/2016REFERRED TO ENVIRONMENTAL CONSERVATION
05/23/2016COMMITTEE DISCHARGED AND COMMITTED TO RULES
05/23/2016ORDERED TO THIRD READING CAL.983
05/24/2016PASSED SENATE
05/24/2016DELIVERED TO ASSEMBLY
05/24/2016referred to environmental conservation
Go to top

S03505 Committee Votes:

Go to top

S03505 Floor Votes:

There are no votes for this bill in this legislative session.
Go to top

S03505 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                         3505--A
            Cal. No. 538
 
                               2015-2016 Regular Sessions
 
                    IN SENATE
 
                                    February 11, 2015
                                       ___________
 
        Introduced  by  Sen.  YOUNG  -- read twice and ordered printed, and when
          printed to be committed to the Committee on Environmental Conservation
          -- reported favorably from said committee, ordered to first and second
          report, ordered to a third reading,  amended  and  ordered  reprinted,
          retaining its place in the order of third reading
 
        AN ACT to authorize an easement on a portion of real property within the
          Boutwell  Hill  state  forest  in  the  county  of  Chautauqua for the
          location  of  electric  collection  or  distribution   facilities   in
          connection  with a wind powered electric generation project located in
          the towns of Charlotte and/or Cherry Creek
 
          The People of the State of New York, represented in Senate and  Assem-
        bly, do enact as follows:
 
     1    Section  1. Legislative intent. A proposed wind generation project, in
     2  the county of Chautauqua in the towns of Charlotte and/or Cherry  Creek,
     3  could  potentially generate up to 200 megawatts of clean renewable elec-
     4  tricity from wind power with minimal impact on the environment  compared
     5  with  other  electric  generation sources. To maximize the production of
     6  electricity from such wind power  project,  an  electric  collection  or
     7  distribution  line would need to pass through a portion of real property
     8  immediately adjacent to or within the right  of  ways  of  public  roads
     9  running  through  the  Boutwell Hill state forest. The legislature finds
    10  that it will serve a useful public purpose to authorize  the  department
    11  of  environmental conservation to execute an easement agreement for real
    12  property within the Boutwell Hill state forest for  such  collection  or
    13  distribution  line  and  appropriate  access,  in  the  event  that such
    14  collection or distribution line proposed to be located on such  easement
    15  lands  is  certified  pursuant  to article 7 or 10 of the public service
    16  law.
    17    § 2. Notwithstanding the provisions of section 9-0501 of the  environ-
    18  mental  conservation law and the provisions of the public lands law, the
    19  department of environmental conservation is authorized to grant an ease-
 
         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD00622-03-5

        S. 3505--A                          2
 
     1  ment for an electric collection or distribution line  on  real  property
     2  within  the Boutwell Hill state forest, which meets the following condi-
     3  tions:
     4    (a)  The  easement  is for an electric collection or distribution line
     5  which is part of a wind powered electric generation project  located  in
     6  the towns of Charlotte and/or Cherry Creek.
     7    (b) The easement is for a portion of property within the Boutwell Hill
     8  state  forest  owned by the state and managed by the department of envi-
     9  ronmental conservation. The collection or  distribution  line  shall  be
    10  located  within  50  feet of the center line of the road corridor within
    11  the state forest and, should a portion of the line not be located  along
    12  a  road corridor, the corridor for such line shall not exceed 50 feet in
    13  width and 1500 feet in length across Boutwell Hill state forest.  In  no
    14  event shall the location of the electric collection or distribution line
    15  require  the  cutting of trees greater than 50 feet from such collection
    16  or distribution line placed in or adjacent to such roads or 25 feet from
    17  the center line of any corridor which is not adjacent to a road.
    18    (c) The easement will be conveyed by the department  of  environmental
    19  conservation  and take effect only in the event a collection or distrib-
    20  ution line proposed to be located on such easement  lands  is  certified
    21  and  approved  as  part  of  a wind powered electric generation facility
    22  pursuant to article 7 and/or 10 of the public service law.
    23    (d) The easement shall terminate  when  the  associated  wind  powered
    24  electric  generation project ceases to operate for an extended period of
    25  time as set forth in the easement and the easement shall then revert  to
    26  the state to be managed by the department of environmental conservation.
    27  Prior to reversion, any collection or distribution lines and any infras-
    28  tructure  related thereto shall be removed by the entity controlling the
    29  lines.
    30    § 3. (a) In entering into the easement described  in  section  two  of
    31  this  act, the department of environmental conservation is authorized to
    32  grant such easement without bid and for  such  reasonable  consideration
    33  that  such  department  deems  proper, upon application by an authorized
    34  officer or employee of the entity proposing  the  wind-powered  electric
    35  generation  project described in section two hereof.  Reasonable consid-
    36  eration shall take the form of the conveyance of  an  interest  in  real
    37  property  to  the state or restorations or improvement to state lands in
    38  region 9 of the  department  of  environmental  conservation.    Special
    39  consideration shall be given to projects listed in the regional priority
    40  conservation  projects  list  in  region  9 as part of this state's open
    41  space conservation plan. The total payment shall not exceed the value of
    42  the easement to be conveyed by the state  plus  twenty  percent  of  the
    43  value of such easement.
    44    (b) Prior to executing the easement, an authorized officer or employee
    45  of  the  entity  applying  to  propose a transmission or collection line
    46  route through the Boutwell Hill state forest as part of  an  application
    47  pursuant  to  article 7 or 10 of the public service law, shall provide a
    48  survey of the easement and appraisal thereon to the department of  envi-
    49  ronmental conservation and shall prepare the easement, subject to review
    50  and approval by the department.
    51    (c) The grant of the easement is conditioned on, first, the conveyance
    52  of  the  exchange  parcel to this state, and second, compliance with the
    53  environmental, health, safety and alternative reviews and subject to the
    54  provisions of article 7 and/or 10 of the public service law.
    55    (d) Any entity cutting forest growth on this easement shall pay a  tax
    56  pursuant to subdivision 5 of section 480  of the real property tax law.

        S. 3505--A                          3
 
     1    § 4. The applicant for the easement shall be responsible for the prep-
     2  aration,  filing  and recording of all required easement maps or surveys
     3  and related easement documents. The department of environmental  conser-
     4  vation shall cause any maps or surveys and related easement documents to
     5  be  filed in the regional office of such department wherein the Boutwell
     6  Hill state forest is  located  and  such  additional  locations  as  the
     7  department  deems  appropriate.  Such  maps  and  easement shall also be
     8  recorded by the applicant with the office of general services.
     9    § 5. This act shall constitute sufficient proof of land  control  with
    10  respect  to  proposed  easement  routes for a collection or distribution
    11  line through the Boutwell Hill state forest for the purposes of  compli-
    12  ance  with  the  application  requirements  of  articles 7 and 10 of the
    13  public service law, and any associated regulations.
    14    § 6. This act shall take effect immediately.