Amd §§1005, 1003 & 1014, Pub Auth L
 
Enacts the "New York Power Authority Public Renewables Standby Act"; authorizes the power authority of the state of New York to support the goal of the climate leadership and community protection act by entering into contracts with companies, not subject to the public service commission's cost-of-service ratemaking, to procure through a competitive process the power and/or renewable energy credits from any renewable energy project in New York state; increases the number of trustees of the power authority to seventeen.
Go to top    

S04229 Actions:

BILL NOS04229
 
02/06/2023REFERRED TO ENERGY AND TELECOMMUNICATIONS
01/03/2024REFERRED TO ENERGY AND TELECOMMUNICATIONS
Go to top

S04229 Committee Votes:

Go to top

S04229 Floor Votes:

There are no votes for this bill in this legislative session.
Go to top

S04229 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                          4229
 
                               2023-2024 Regular Sessions
 
                    IN SENATE
 
                                    February 6, 2023
                                       ___________
 
        Introduced  by  Sen.  PARKER -- read twice and ordered printed, and when
          printed to be committed to the Committee on  Energy  and  Telecommuni-
          cations
 
        AN  ACT to amend the public authorities law, in relation to implementing
          the "New York Power Authority Public Renewables Standby Act"

          The People of the State of New York, represented in Senate and  Assem-
        bly, do enact as follows:
 
     1    Section  1.  Short  title. This act shall be known and may be cited as
     2  the "New York Power Authority Public Renewables Standby Act".
     3    § 2.  Section 1005 of the public authorities law is amended by  adding
     4  fourteen new subdivisions 30, 31, 32, 33, 34, 35, 36, 37,  38,  39,  40,
     5  41, 42, and 43 to read as follows:
     6    30. (a) The authority is authorized to support the goal of the climate
     7  leadership  and  community protection act, which requires that a minimum
     8  of seventy percent of the statewide  electric  generation  to  meet  the
     9  electrical  energy  requirements in New York state in the year two thou-
    10  sand thirty shall be generated by renewable energy systems, by  entering
    11  into contracts with companies, not subject to the public service commis-
    12  sion's  cost-of-service  ratemaking,  to  procure  through a competitive
    13  process the power and/or renewable energy  credits  from  any  renewable
    14  energy  project in New York state. Such competitive procurement shall be
    15  through at least one  annual  solicitation  until  such  time  that  the
    16  authority  has  procured  sufficient  renewable  energy and/or renewable
    17  energy credits to comply with the renewable energy targets  in  subdivi-
    18  sions thirty-two, thirty-four, thirty-five and forty of this section.
    19    (b)  Within  one  year  of the effective date of this subdivision, and
    20  biennially thereafter, the authority, in consultation with the New  York
    21  state  energy  research  and  development  authority, the New York state
    22  department of public service, and the New York state independent  system
    23  operator,  shall  evaluate,  after  an  opportunity  for public comment,
    24  whether the renewable energy goal of the climate leadership and communi-
 
         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD08865-02-3

        S. 4229                             2
 
     1  ty protection act is likely to be met within the  timeframe  established
     2  by  such  law.  If such evaluation determines that such renewable energy
     3  goal is not likely to be met within the timeframe  established  by  law,
     4  then  the  authority  is  authorized to purchase, acquire, plan, design,
     5  engineer, finance, construct, operate, manage, improve  and/or  maintain
     6  any renewable energy project in New York state if the following criteria
     7  are  met:  (i)  the  number of proposed renewable energy projects in the
     8  interconnection queue of the federally designated electric  bulk  system
     9  operator  for  New  York  state is inadequate to meet the public service
    10  commission's proposed annual schedule for procurements to  achieve  such
    11  renewable  energy goal; and (ii) the responses to any competitive solic-
    12  itations that have been issued by the authority and the New  York  state
    13  energy  research  and development authority to incent the development of
    14  renewable energy projects in New York are inadequate to meet  the  goals
    15  of  such  competitive  solicitations.  Notwithstanding  any provision of
    16  section one thousand twelve of this title to the contrary, the authority
    17  shall enter into agreements to make  payments  in  lieu  of  taxes  with
    18  respect  to any renewable energy projects that it may purchase, acquire,
    19  construct, operate, manage, improve and/or maintain. Purchase and acqui-
    20  sition under this subdivision and subdivision thirty-two of this section
    21  shall only be from willing sellers.
    22    (c) For the purposes of this subdivision and subdivisions  thirty-one,
    23  thirty-two,  thirty-three, thirty-four, thirty-five, thirty-six, thirty-
    24  seven,  thirty-eight,  thirty-nine,  forty,  forty-one,  forty-two   and
    25  forty-three  of this section, the following terms shall have the follow-
    26  ing meanings:
    27    (i) "renewable energy" shall have the same meaning as renewable energy
    28  systems as set forth in section sixty-six-p of the public service law.
    29    (ii) "renewable energy project" shall be defined as all infrastructure
    30  which generates, stores, distributes or transmits  renewable  energy  or
    31  thermal  energy  as  defined  in subparagraph (i) of this paragraph, and
    32  includes the construction, installation and/or  operation  of  ancillary
    33  facilities or equipment done in connection with any such renewable ener-
    34  gy  systems  projects,  including,  but  not  limited to, energy storage
    35  projects in combination with such  renewable  energy  systems  projects,
    36  electric  vehicle  charging infrastructure and offshore wind support and
    37  installation vessels owned by the authority, and  the  production,  use,
    38  and sale of green hydrogen defined as hydrogen produced through electro-
    39  lysis powered using one hundred percent renewable energy.
    40    31. Where a renewable energy site appropriate for New York state falls
    41  into  federal  jurisdiction,  the  authority  may  participate  in lease
    42  auctions in an attempt to obtain ownership of that area,  if  authorized
    43  pursuant  to  subdivision  thirty  of  this  section, and shall have the
    44  authority to construct and operate electricity transmission  infrastruc-
    45  ture to facilitate and enable renewable energy project operation.
    46    32.  (a)  Notwithstanding  any other provision of law to the contrary,
    47  the authority shall, on or after January  first,  two  thousand  thirty,
    48  only  generate  renewable energy and shall only purchase, acquire, plan,
    49  design, engineer, finance, and construct generation facilities  for  the
    50  purpose of generating renewable energy pursuant to subdivision thirty of
    51  this  section. The authority shall phase out its use of existing non-re-
    52  newable generation no later than December thirtieth, two thousand  thir-
    53  ty,  unless  the  authority provides to its trustees, and makes publicly
    54  available, an attestation in writing, signed by the  independent  system
    55  operator  and a representative of the regional clean energy hub in which
    56  the facility is located, identifying  the  existence  of  a  reliability

        S. 4229                             3
 
     1  need.  The  authority shall work with the New York state energy research
     2  and development  authority  to  provide  any  funding  necessary  for  a
     3  regional  clean  energy  hub  to meet the needs of this subdivision. The
     4  authority,  in  consultation with the independent system operator, shall
     5  ensure that the phase-out of its existing non-renewable generation  does
     6  not  lead  to  an increase in the delivery of out-of-state non-renewable
     7  generation into the New York state electric grid. For  the  purposes  of
     8  this subdivision, a "reliability need" means an electricity system need,
     9  which if unmet, would result in a violation of the electric power system
    10  planning and operating policies, standards, criteria, guidelines, proce-
    11  dures,  and rules promulgated by the North American Electric Reliability
    12  Corporation ("NERC"), Northeast Power Coordinating Council ("NPCC"), and
    13  the New York State Reliability Council ("NYSRC"), as they may be amended
    14  from time to time.
    15    (b) If authorized pursuant to subdivision thirty of this section,  the
    16  authority shall prioritize funding, siting, building, and owning renewa-
    17  ble  energy projects, which: (i) actively benefit disadvantaged communi-
    18  ties as defined by the climate justice working group; (ii) minimize harm
    19  to wildlife, ecosystems, public health, and public safety; (iii) do  not
    20  violate  Indigenous  rights  or sovereignty; and (iv) which are the most
    21  cost-effective to the state according to the best available cost  model-
    22  ing  research.  The  types  of  renewable  energy projects the authority
    23  builds shall be determined and prioritized in consultation with affected
    24  labor unions and community organizations via the New York  state  energy
    25  research and development authority's regional clean energy hubs.
    26    33.  (a)  Within  two years of the effective date of this subdivision,
    27  the authority shall make public a ten-year climate and resiliency  plan.
    28  Such  climate and resiliency plan shall be designed to minimize costs to
    29  ratepayers, while balancing the interests of employees, grid reliability
    30  and resiliency, disadvantaged communities  as  defined  by  the  climate
    31  justice working group, and the environment. Such plan shall be developed
    32  in consultation with the New York state independent system operator, the
    33  New  York  state energy research and development authority, the New York
    34  state department of public service, and climate and resiliency  experts,
    35  labor  organizations, environmental justice communities, residential and
    36  small business ratepayer advocates, and community organizations via  the
    37  New  York  state  energy  research  and development authority's regional
    38  clean energy hubs. Such resiliency  plan  shall  outline  the  renewable
    39  energy  projects the authority plans to build, if authorized pursuant to
    40  subdivision thirty of this  section.  The  resiliency  plan  also  shall
    41  outline  how  the  authority plans to phase out non-renewable assets and
    42  how the authority plans to comply with the climate leadership and commu-
    43  nity protection act and the renewable  energy  targets  in  subdivisions
    44  thirty-two,  thirty-four,  thirty-five  and  forty  of this section, and
    45  efforts to improve energy and electric grid resiliency.  The plan  shall
    46  include  a  review  of the state's progress towards the renewable energy
    47  goal of the climate leadership and community protection act. The author-
    48  ity shall update such plan biennially, after implementing  the  require-
    49  ments  pursuant  to  subdivision thirty of this section and after public
    50  comment and a hearing. The authority shall include in the  updated  plan
    51  the  renewable energy projects it plans to build, if authorized pursuant
    52  to subdivision thirty of this section, to ensure the  state  meets  such
    53  goal,  including  the  permit  applications submitted, the stage of each
    54  project in the development process, when such projects are  expected  to
    55  be  commissioned,  and  any  barriers  to  deployment experienced by the
    56  authority. If the authority has identified a reliability need  to  main-

        S. 4229                             4

     1  tain its existing non-renewable generation pursuant to subdivision thir-
     2  ty-two  of  this  section,  the authority shall identify in the biennial
     3  plan  update  report  the  renewable  energy  project,  transmission  or
     4  distribution  infrastructure,  demand response, or other such project or
     5  projects that the authority, if authorized pursuant to subdivision thir-
     6  ty of this section, or another entity, only if such entity has  obtained
     7  all  the  necessary permits and has begun construction, plans to develop
     8  to meet the reliability need.
     9    (b) Within two years of the effective date of  this  subdivision,  the
    10  authority  shall  make  public a democratization plan, with a mandate to
    11  implement the plan within two years of its completion. Such  plan  shall
    12  be  created  in partnership with, and codesigned with, a statewide alli-
    13  ance of community organizations with at least  five  years'  history  of
    14  working on energy democracy and implementation issues, providing funding
    15  for this alliance as necessary for their participation in the completion
    16  of  the  plan. Such plan shall ensure that the authority's activities to
    17  scale up renewable build out,  if  authorized  pursuant  to  subdivision
    18  thirty of this section, across the state occurs in line with the princi-
    19  ples of energy democracy and transparency.
    20    (c) The authority shall hold at least eight public hearings within two
    21  years  of  the effective date of this subdivision related to the climate
    22  and resiliency plan. The hearings shall be publicized in  various  forms
    23  of  media,  including  but not limited to the authority's website, local
    24  newspapers and social media platforms, and shall also be accessible  via
    25  livestream.  In  advance of such hearings, the authority shall conspicu-
    26  ously post written notice of such hearings in all  authority  facilities
    27  and  New  York  state energy research and development authority regional
    28  clean energy hubs on a sign posted at each facility  entrance  and  exit
    29  used  by  employees, and shall provide at least two weeks advance notice
    30  of such hearings to authority customers by directly  communicating  such
    31  notice  to  customer  phone, email and mailing lists.  Hearings shall be
    32  permitted between 12:00 PM to 3:00 PM and 6:00 PM to 9:00  PM,  and  the
    33  authority shall provide all speakers with the option to sign up to speak
    34  within  those  three hour windows such that no speaker shall wait longer
    35  than three hours to speak. In addition to oral testimony, written testi-
    36  mony from the public for such hearings shall be accepted by the authori-
    37  ty no less than two weeks after each hearing. Each speaker shall have at
    38  least three minutes to speak, and a remote option shall be provided  for
    39  submitting comments via video conference, phone, including short message
    40  services (SMS) text messages and/or written comment, which shall be read
    41  aloud.  Provisions  for  translation  services,  American  sign language
    42  interpretation, closed captioning, and access to accommodations provided
    43  by the Americans with Disabilities Act shall be provided upon request.
    44    (d) The authority shall maintain all data, meeting minutes, recordings
    45  and documents that do not include personal customer information, includ-
    46  ing but not limited to depreciation schedules, annual  financial  state-
    47  ments  of itemized spending, environmental impact statements, cost-bene-
    48  fit analyses, climate and resiliency  plans,  renewable  energy  project
    49  plans,  and annual reports on operations, customer service, reliability,
    50  resiliency  and  sustainability.  All  such   data,   meeting   minutes,
    51  recordings  and  documents  shall  be  made available on the authority's
    52  website, or otherwise made accessible by the authority upon request. All
    53  such records shall be maintained as business records for  a  minimum  of
    54  ten years. The state comptroller shall audit the authority at least once
    55  every  two  years  until  two  thousand  thirty to ascertain whether the
    56  authority is in compliance with the renewable energy targets outlined in

        S. 4229                             5
 
     1  this subdivision and subdivisions thirty-two, thirty-four,  thirty-five,
     2  and forty of this section and whether the authority's spending and oper-
     3  ations  are  effectively  and efficiently promoting the common good. The
     4  most  recent  comptroller  audits  shall  also  be made available on the
     5  authority's website, or otherwise made accessible by the authority  upon
     6  request.
     7    (e)(i)  The  authority, in consultation with the New York state energy
     8  research and development authority and the  public  service  commission,
     9  shall  develop and conduct an energy efficiency and energy audit program
    10  to identify public buildings most in need of  retrofits  and  efficiency
    11  measures.  Such program shall provide for energy efficiency projects and
    12  services competitively procured solely from  energy  services  companies
    13  through written requests for proposals from third party providers of all
    14  goods  and  services,  including but not limited to, the installation of
    15  renewable heating and cooling systems, and, when feasible,  other  green
    16  building  projects  as  defined  in section 58-0101 of the environmental
    17  conservation law, in public housing and public schools by the  year  two
    18  thousand  thirty-five,  prioritizing first public affordable housing and
    19  public schools in disadvantaged communities. The  authority  shall  hire
    20  authority  contractors  to  perform  energy  audits, retrofits and other
    21  efficiency programs for these  buildings,  and  provide  incentives,  in
    22  conjunction  with  the  New  York  state energy research and development
    23  authority, for energy efficient  appliances  and  induction  stoves,  as
    24  needed, to meet the climate goals outlined in the climate leadership and
    25  community  protection  act.  If  the buildings selected for this program
    26  need mold remediation measures or lead abatement measures to be  carried
    27  out  before  energy  efficiency  measures can be safely implemented, the
    28  authority shall also hire contractors to perform lead abatement measures
    29  and/or mold remediation measures for these buildings.
    30    (ii) The authority shall annually post on its website a report  evalu-
    31  ating  the energy efficiency program, including, but not limited to, the
    32  number of customers served by the efficiency program, the customer demo-
    33  graphics, the number of  retrofits  and  energy  audits  performed,  the
    34  number  of  jobs  created  and  employee demographics, and the amount of
    35  energy and dollars saved as a result of the program.
    36    (iii) All work subject to this subdivision shall be considered  public
    37  work,  subject  to  articles  eight and nine of the labor law, and shall
    38  utilize a project labor agreement. For  purposes  of  this  subdivision,
    39  "project  labor  agreement"  shall mean a pre-hire collective bargaining
    40  agreement between the authority, or a  third  party  on  behalf  of  the
    41  authority,  and a bona fide building and construction trade labor organ-
    42  ization establishing the labor organization as the collective bargaining
    43  representative for all persons who will perform work on  a  public  work
    44  project, and which provides that only contractors and subcontractors who
    45  sign  a pre-negotiated agreement with the labor organization can perform
    46  project work. All contractors and subcontractors  associated  with  this
    47  work  shall  be required to utilize apprenticeship agreements as defined
    48  by article twenty-three of the labor law.
    49    (f) The authority shall submit an annual report to the governor and to
    50  the legislature which shall be made available to the public. Such report
    51  shall include the:
    52    (A) Ten year climate and resiliency plan described in paragraph (a) of
    53  this subdivision;
    54    (B) Amount of energy produced by each facility;
    55    (C) Energy transferred between facilities within the authority;
    56    (D) Energy transferred outside of the authority for sale;

        S. 4229                             6
 
     1    (E) Kilowatt-hour sales by project;
     2    (F) Revenues and costs for each project facility of the authority;
     3    (G) Accumulated provision for depreciation of each project facility of
     4  the authority;
     5    (H) Financial and operating information in the aggregate of the energy
     6  efficiency program;
     7    (I)  Enrollment  in and effectiveness of renewable energy auto-enroll-
     8  ment, retrofit, and energy efficient appliance programs;
     9    (J) Any projected rate increase for the year; and
    10    (K) An analysis of the authority's actions to ensure  the  state  will
    11  meet  the  renewable energy goal of the climate leadership and community
    12  protection act.
    13    34. Notwithstanding any other provision of law to the contrary, on  or
    14  after January first, two thousand thirty, the authority is authorized to
    15  competitively  procure electricity from energy service companies through
    16  written requests for proposals from third party providers of  all  goods
    17  and services for all state owned, leased, controlled, or operated build-
    18  ings,  and  on  or  after  January  first, two thousand thirty-five, the
    19  authority is authorized to competitively procure electricity from energy
    20  service companies through written  requests  for  proposals  from  third
    21  party  providers of goods and services, for all municipal owned, leased,
    22  controlled, or operated buildings that use electricity.
    23    35. (a) The authority is  authorized  to  competitively  procure  from
    24  energy  service  companies  through  written requests for proposals from
    25  third party providers of goods and services renewable energy  on  behalf
    26  of  residential end-use customers and CCA communities, both of which may
    27  choose to be customers of the authority.  Any  excess  renewable  energy
    28  procured  by  the authority and not used or stored by state or municipal
    29  owned or leased buildings shall  be  sold  directly  to  low-to-moderate
    30  income households, which choose to be customers of the authority, first,
    31  prioritizing low-to-moderate income households in disadvantaged communi-
    32  ties,  and  at  a rate that is fifty percent less than the energy supply
    33  rate of the utility in the customer's service territory.  Any  remaining
    34  excess  renewable energy procured by the authority shall be sold through
    35  the wholesale market at the wholesale cost. For  the  purposes  of  this
    36  paragraph,  the  term  "low-to-moderate  income  households"  shall mean
    37  households with annual incomes at or below eighty percent  of  the  area
    38  median income of the county or metro area where they reside.
    39    (b)  Within  three years following the effective date of this subdivi-
    40  sion, the authority's trustees, in consultation with the New York  state
    41  energy  research and development authority's regional clean energy hubs,
    42  shall develop a progressive rate structure based on  income  and  energy
    43  usage  to  be  offered to its customers and to end-use customers and CCA
    44  communities.
    45    (c) The authority shall work with the office of temporary and disabil-
    46  ity assistance to assist low-income customers to access  the  low-income
    47  home  energy  assistance  program  and  other utility benefits and shall
    48  offer deferred payment agreement payment plans for customers  that  fall
    49  into arrears.
    50    (d)  The  authority, upon consultation with the New York state depart-
    51  ment of public service, is authorized to sell up to  thirty  percent  of
    52  the  electricity  that  it  competitively  procures  from energy service
    53  companies through  written  requests  for  proposals  from  third  party
    54  providers of goods and services for residential and commercial customers
    55  to customers of the Long Island power authority, established under title
    56  one-A  of  this  article,  which  choose to receive electricity from the

        S. 4229                             7
 
     1  authority, and the Long Island power authority is authorized to purchase
     2  such power.
     3    36. All new renewable energy projects subject to this section shall be
     4  considered  public work, subject to articles eight and nine of the labor
     5  law and shall utilize a project labor agreement. For  purposes  of  this
     6  subdivision,  "project labor agreement" shall mean a pre-hire collective
     7  bargaining agreement between the authority, or a third party  on  behalf
     8  of  the authority, and a bona fide building and construction trade labor
     9  organization establishing  the  labor  organization  as  the  collective
    10  bargaining  representative  for  all  persons who will perform work on a
    11  public work project,  and  which  provides  that  only  contractors  and
    12  subcontractors who sign a pre-negotiated agreement with the labor organ-
    13  ization  can  perform  project  work. All contractors and subcontractors
    14  associated with this work shall be required  to  utilize  apprenticeship
    15  agreements as defined by article twenty-three of the labor law.
    16    37.  The  authority,  in  consultation with labor organizations, shall
    17  develop a comprehensive plan to transition, train, or retrain  employees
    18  that  are  impacted  by  the  New York power authority public renewables
    19  standby act, and shall establish and contribute  to  a  just  transition
    20  fund  that  shall  make  funding  available  for  worker  transition and
    21  retraining.
    22    38. The authority shall include requirements  in  any  procurement  or
    23  development  of  a  renewable  energy project, as defined in subdivision
    24  thirty of this section, that the components and parts shall be  supplied
    25  with  equipment  produced  or  made  in whole or substantial part in the
    26  United States, its territories or possessions. The authority's trustees,
    27  in consultation with the New York state energy research and  development
    28  authority,  may  waive  the procurement and development requirements set
    29  forth in this subdivision if the trustees determine that:  the  require-
    30  ments would not be in the public interest; the requirements would result
    31  in  unreasonable  costs;  obtaining  such  infrastructure components and
    32  parts in the United States would increase the cost of a renewable energy
    33  project by an unreasonable amount; or such components or parts cannot be
    34  produced, made, or assembled in the  United  States  in  sufficient  and
    35  reasonably  available quantities or of satisfactory quality. Such deter-
    36  mination shall be made on an annual basis no later than  December  thir-
    37  ty-first  after  providing notice and an opportunity for public comment,
    38  and be made publicly available, in writing, on the  authority's  website
    39  with  a  detailed  explanation  of the findings leading to such determi-
    40  nation. If the authority's trustees have issued determinations for three
    41  consecutive years that no such waiver  is  warranted  pursuant  to  this
    42  subdivision,  then  the authority shall no longer be required to provide
    43  the annual determination required by this subdivision.
    44    39. The authority  shall  work  with  existing  workforce  development
    45  programs,  union  apprenticeship programs, and regional community energy
    46  hubs to publish a report on the ways that the construction of  renewable
    47  projects  can  best  support the development of skilled, well paid local
    48  workforces in the renewable energy sector, and shall  provide  financial
    49  support  through the just transition fund established pursuant to subdi-
    50  vision thirty-seven of  this  section  for  pre-apprenticeship  programs
    51  through local community-based organizations that work with disadvantaged
    52  communities and union run workforce development institutions, where this
    53  support  is  found  to be necessary to the effective development of this
    54  workforce according to the report.
    55    40. For energy projects that the authority, (a) builds on, if  author-
    56  ized pursuant to subdivision thirty of this section, or (b) competitive-

        S. 4229                             8
 
     1  ly  procures  from energy service companies through written requests for
     2  proposals from third party providers of goods and services for,  proper-
     3  ties of the New York city housing authority, including heat pump instal-
     4  lations,  retrofits, weatherization measures, and lead, mold, and asbes-
     5  tos remediation, both the authority and its contractors shall prioritize
     6  hiring residents of  these  properties,  provided  that  residents  meet
     7  considerations  of  availability, interest, skill level and training. No
     8  provisions of this subdivision shall alter the status of any  Section  9
     9  housing.  The  authority shall consult the residents or occupants of all
    10  public buildings where the authority is building or  procuring  projects
    11  to  assess  their needs and minimize disruption, nuisance, public health
    12  risks, and displacement during any  remediation,  retrofit,  weatheriza-
    13  tion,  heat  pump  installations, or other construction the authority or
    14  its contractors perform. All work subject to this subdivision  shall  be
    15  considered  public work, subject to articles eight and nine of the labor
    16  law, and shall utilize a project labor agreement. For purposes  of  this
    17  subdivision,  "project labor agreement" shall mean a pre-hire collective
    18  bargaining agreement between the authority, or a third party  on  behalf
    19  of  the authority, and a bona fide building and construction trade labor
    20  organization establishing  the  labor  organization  as  the  collective
    21  bargaining  representative  for  all  persons who will perform work on a
    22  public work project,  and  which  provides  that  only  contractors  and
    23  subcontractors who sign a pre-negotiated agreement with the labor organ-
    24  ization  can  perform  project  work. All contractors and subcontractors
    25  associated with this work shall be required  to  utilize  apprenticeship
    26  agreements as defined by article twenty-three of the labor law.
    27    41.  (a)  Nothing  in  the  New York power authority public renewables
    28  standby act shall alter the rights or benefits, and privileges,  includ-
    29  ing,  but  not  limited  to  terms  and  conditions of employment, civil
    30  service status,  and  collective  bargaining  unit  membership,  of  any
    31  current employees of the authority.
    32    (b)  Nothing  in  the New York state power authority public renewables
    33  standby act shall result in: (i) the discharge, displacement, or loss of
    34  position, including partial displacement such  as  a  reduction  in  the
    35  hours  of  non-overtime  work,  wages,  or employment benefits; (ii) the
    36  impairment of  existing  collective  bargaining  agreements;  (iii)  the
    37  transfer  of  existing  duties  and  functions;  or (iv) the transfer of
    38  future duties and functions, of any currently employed  worker  impacted
    39  by this act who agrees to be retrained.
    40    42.  The  authority shall enter into a memorandum of understanding for
    41  the operation and maintenance of a renewable  energy  project  developed
    42  pursuant  to  the New York power authority public renewables standby act
    43  with a bona fide labor organization of  jurisdiction  that  is  actively
    44  engaged  in  representing  transitioning  employees  from  non-renewable
    45  generation facilities. Such memorandum shall be entered  into  prior  to
    46  the  completion date of a renewable energy project and shall be an ongo-
    47  ing material condition of authorization to operate and maintain a renew-
    48  able energy project developed pursuant to the New York  power  authority
    49  public  renewables  standby  act. The memorandum shall only apply to the
    50  employees necessary for the maintenance and operation of such  renewable
    51  energy  generation  projects.  Such  memorandum shall contain but not be
    52  limited to safety and training standards,  disaster  response  measures,
    53  guaranteed  hours,  staffing  levels, pay rate protection and retraining
    54  programs. The employees eligible for  these  positions  shall  first  be
    55  selected  from  and  offered to a pool of transitioning workers who have
    56  lost their employment or will be losing their employment in the  non-re-

        S. 4229                             9
 
     1  newable  energy generation sector. Such list of potential employees will
     2  be provided by affected unions and provided to the department of  labor.
     3  The  department  of  labor  shall  update  and  provide such list to the
     4  authority   ninety   days   prior   to   purchase,  acquisition,  and/or
     5  construction of any project under the New York  power  authority  public
     6  renewables standby act.
     7    43. The authority shall comply with the objectives and goals of certi-
     8  fied  minority  and women-owned business enterprises pursuant to article
     9  fifteen-A of the executive law and certified  service-disabled  veteran-
    10  owned  businesses  pursuant  to  article three of the veterans' services
    11  law. The authority, in consultation with the commissioner of  the  divi-
    12  sion  of  minority  and women's business development and the director of
    13  the division of service-disabled veterans'  business  development  shall
    14  make training and resources available to assist minority and women-owned
    15  business  enterprises and service-disabled veteran-owned business enter-
    16  prises on renewable energy projects to achieve and  maintain  compliance
    17  with  prevailing wage requirements. The authority shall make such train-
    18  ing and resources available online and shall afford minority and  women-
    19  owned  business  enterprises and service-disabled veteran-owned business
    20  enterprises an opportunity to submit comments on such training.
    21    § 3. Section 1003 of the public authorities law, as amended by chapter
    22  766 of the laws of 2005, is amended to read as follows:
    23    § 1003. Trustees. 1. The authority shall consist of [seven]  seventeen
    24  trustees,  five  of whom shall serve respectively for terms of one, two,
    25  three, four and five years, to be appointed by the governor, by and with
    26  the advice and consent of the senate. The  sixth  and  seventh  trustees
    27  shall  be  appointed by the governor, by and with the advice and consent
    28  of the senate, and shall serve  initial  terms  of  one  and  two  years
    29  respectively.  All other trustees shall be appointed as follows: two  by
    30  the governor; four by the temporary president of the senate; and four by
    31  the  speaker  of the assembly; and they shall proportionally be selected
    32  from  labor  union  representatives that represent both employees of the
    33  authority and employees of construction contractors  of  the  authority,
    34  environmental  justice  advocates, community renewable energy advocates,
    35  consumer advocates, and building electrification and energy   efficiency
    36  experts.  For   any appointment   and  vacant  trustee position, the New
    37  York state energy research and development  authority's   clean   energy
    38  hubs  shall  select  qualified candidates that shall be given reasonable
    39  consideration for  an  appointment  as  trustee by the governor, senate,
    40  and assembly. Each trustee shall hold office until a successor has  been
    41  appointed    and  qualified   or until removed by a majority vote of the
    42  legislature or the governor. Each trustee  shall  hold  office  until  a
    43  successor  has  been  appointed  and qualified. At the expiration of the
    44  term of each trustee and of each succeeding trustee [the governor shall,
    45  by and with the advice and consent of the senate, appoint  a  successor,
    46  who shall hold office for a term of five years, or until a successor has
    47  been appointed and qualified. In the event of a vacancy occurring in the
    48  office  of  the trustee by death, resignation or otherwise, the governor
    49  shall, by and with the advice and  consent  of  the  senate,  appoint  a
    50  successor,  who  shall hold office for the unexpired term. Four trustees
    51  shall constitute a quorum for the purpose of  organizing  the  authority
    52  and  conducting  the  business  thereof],  or, in the event of a vacancy
    53  occurring in the office of the trustee by death, resignation  or  other-
    54  wise,  the  original entities who appointed that trustee shall appoint a
    55  successor, after consideration of clean energy hub candidates, who shall
    56  hold office for the unexpired term. Nine  trustees  shall  constitute  a

        S. 4229                            10
 
     1  quorum  for  the  purpose of organizing the authority and conducting the
     2  business thereof. Any authority trustee  or board member may  be  termi-
     3  nated  by  either  a  majority vote of the senate or assembly, or by the
     4  governor.  Reasons  for termination may include, but are not limited to:
     5  failure to meet the renewable energy targets  outlined  in  section  one
     6  thousand  five  of  this title; conflicts of interest; failure to prior-
     7  itize climate justice, environmental justice, or economic justice in the
     8  authority's operations; sexual assault or harassment; or corruption.
     9    2. The trustee chosen as chairman as provided in section one  thousand
    10  four of this title, shall receive an annual salary which shall be set by
    11  the  trustees  of  the  authority, and which shall not exceed the salary
    12  prescribed for the positions listed in paragraph (f) of subdivision  one
    13  of  section  one  hundred  sixty-nine  of the executive law. [Each other
    14  trustee shall not receive a salary or other compensation.] Each  trustee
    15  shall  receive  his or her reasonable expenses in the performance of his
    16  or her duties hereunder. The trustee chosen as  chairman  may  elect  to
    17  become  a  member  of the New York state and local employees' retirement
    18  system on the basis of such compensation to which he  or  she  shall  be
    19  entitled as herein provided notwithstanding the provisions of any gener-
    20  al, special or local law, municipal charter, or ordinance.
    21    § 4. Nothing in this act shall impact the power authority of the state
    22   of New York's existing recharge New York power program, existing hydro-
    23  power  allocations  to  any  municipal  and cooperative electric utility
    24  customers, or any other power allocation program managed by such author-
    25  ity.
    26    § 5. Nothing in this act is intended to limit, impair, or  affect  the
    27  legal  authority  of  the power authority of the state of New York under
    28  any other provision of title 1 of article 5 of  the  public  authorities
    29  law.
    30    §  6.  No section of this act or any action required to be taken under
    31  this act shall be delayed or made contingent upon the completion of  the
    32  plan  required  by subdivision 33 of section 1005 of the public authori-
    33  ties law, as added by section two of this act.
    34    § 7. Section 1014 of the public authorities law, as amended by chapter
    35  388 of the laws of 2011, is amended to read as follows:
    36    § 1014. Public service law not applicable to  authority;  inconsistent
    37  provisions  in  other acts superseded. The rates, services and practices
    38  relating to the generation, transmission, distribution and sale  by  the
    39  authority, of power to be generated from the projects authorized by this
    40  title  shall  not be subject to the provisions of the public service law
    41  nor to regulation by, nor the jurisdiction of the department  of  public
    42  service.  Except  to  the extent article seven of the public service law
    43  applies to the siting and operation  of  a  major  utility  transmission
    44  facility  as  defined therein, and article ten of the public service law
    45  applies to the siting of a major electric generating facility as defined
    46  therein, and except to the  extent  section  eighteen-a  of  the  public
    47  service  law  provides for assessment of the authority for certain costs
    48  relating thereto, and  except  to  the  extent  section ninety-four-c of
    49  the executive law applies to the siting of a major   renewable    energy
    50  facility  as  defined  therein, and section eight of part JJJ of chapter
    51  fifty-eight of the laws of two thousand twenty applies to a host  commu-
    52  nity benefit, and except to the extent section 11-0535-c of the environ-
    53  mental  conservation law applies to an endangered and threatened species
    54  mitigation bank fund, the provisions of the public service  law  and  of
    55  the  environmental  conservation law and every other law relating to the
    56  department of public service or the public service commission or to  the

        S. 4229                            11
 
     1  environmental  conservation  department  or  to the functions, powers or
     2  duties assigned to the division of water power and  control  by  chapter
     3  six  hundred  nineteen of the laws of nineteen hundred twenty-six, shall
     4  so  far  as is necessary to make this title effective in accordance with
     5  its terms and purposes be deemed to  be  superseded,  and  wherever  any
     6  provision  of law shall be found in conflict with the provisions of this
     7  title or inconsistent with the purposes thereof, it shall be  deemed  to
     8  be superseded, modified or repealed as the case may require.
     9    § 8. Combination gas and electric corporations, as defined by subdivi-
    10  sion  14  of  section two of the public service law, shall be prohibited
    11  from designing,  planning,  developing,  siting,  constructing,  owning,
    12  acquiring,  improving, reconstructing, rehabilitating, completing, main-
    13  taining,  managing,  operating,  installing,  implementing,   providing,
    14  administering, and leasing: renewable energy systems as defined by para-
    15  graph  (b)  of  subdivision 1 of section 66-p of the public service law;
    16  and electric generating facilities constructed on or after the effective
    17  date of this act.
    18    § 9. Severability clause. If any clause, sentence, paragraph, subdivi-
    19  sion, or section of this act shall be adjudged by any court of competent
    20  jurisdiction to be invalid, such judgment shall not affect,  impair,  or
    21  invalidate the remainder thereof, but shall be confined in its operation
    22  to  the  clause,  sentence,  paragraph,  subdivision, or section thereof
    23  directly involved in the controversy in which such judgment  shall  have
    24  been rendered. It is hereby declared to be the intent of the legislature
    25  that  this  act  would have been enacted even if such invalid provisions
    26  had not been included herein.
    27    § 10. This act shall take effect immediately.