S04388 Summary:

BILL NOS04388
 
SAME ASNo Same As
 
SPONSORGRIFFO
 
COSPNSR
 
MLTSPNSR
 
Amd §§155.30 & 165.45, Pen L
 
Relates to grand larceny in the fourth degree and criminal possession of stolen property in the fourth degree of metal wire used as a conductor to transmit and distribute electrical energy.
Go to top    

S04388 Actions:

BILL NOS04388
 
02/13/2017REFERRED TO CODES
01/03/2018REFERRED TO CODES
Go to top

S04388 Committee Votes:

Go to top

S04388 Floor Votes:

There are no votes for this bill in this legislative session.
Go to top

S04388 Text:



 
                STATE OF NEW YORK
        ________________________________________________________________________
 
                                          4388
 
                               2017-2018 Regular Sessions
 
                    IN SENATE
 
                                    February 13, 2017
                                       ___________
 
        Introduced  by  Sen.  GRIFFO -- read twice and ordered printed, and when
          printed to be committed to the Committee on Codes
 
        AN ACT to amend the penal law, in  relation  to  grand  larceny  in  the
          fourth degree and criminal possession of stolen property in the fourth
          degree  of  metal  wire used as a conductor to transmit and distribute
          electrical energy
 
          The People of the State of New York, represented in Senate and  Assem-
        bly, do enact as follows:
 
     1    Section  1. Section 155.30 of the penal law is amended by adding a new
     2  subdivision 12 to read as follows:
     3    12. The property consists of metal wire which is owned by an  electric
     4  company  or  public  utility  operated by a municipality or district and
     5  which functions as a conductor to  transmit  and  distribute  electrical
     6  energy in the electrical grid.
     7    § 2. Section 165.45 of the penal law is amended by adding a new subdi-
     8  vision 8 to read as follows:
     9    8.  The  property consists of metal wire which is owned by an electric
    10  company or public utility operated by a  municipality  or  district  and
    11  which  functions  as  a  conductor to transmit and distribute electrical
    12  energy in the electrical grid.
    13    § 3. This act shall take effect on the ninetieth day  after  it  shall
    14  have become a law.
 
 
 
 
         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD09802-01-7