S06861 Summary:
BILL NO | S06861A |
  | |
SAME AS | SAME AS UNI. A08609-A |
  | |
SPONSOR | LAVALLE |
  | |
COSPNSR | |
  | |
MLTSPNSR | |
  | |
Ren §§1020-ii - 1020-kk to be §§1020-jj - 1020-ll, add §1020-ii, Pub Auth L | |
  | |
Relates to requiring the Long Island Power Authority to provide public notice prior to the construction of utility transmission facilities. |
S06861 Actions:
BILL NO | S06861A | |||||||||||||||||||||||||||||||||||||||||||||||||
  | ||||||||||||||||||||||||||||||||||||||||||||||||||
09/01/2017 | REFERRED TO RULES | |||||||||||||||||||||||||||||||||||||||||||||||||
01/03/2018 | REFERRED TO CORPORATIONS, AUTHORITIES AND COMMISSIONS | |||||||||||||||||||||||||||||||||||||||||||||||||
05/15/2018 | 1ST REPORT CAL.1243 | |||||||||||||||||||||||||||||||||||||||||||||||||
05/16/2018 | 2ND REPORT CAL. | |||||||||||||||||||||||||||||||||||||||||||||||||
05/22/2018 | ADVANCED TO THIRD READING | |||||||||||||||||||||||||||||||||||||||||||||||||
06/04/2018 | PASSED SENATE | |||||||||||||||||||||||||||||||||||||||||||||||||
06/04/2018 | DELIVERED TO ASSEMBLY | |||||||||||||||||||||||||||||||||||||||||||||||||
06/04/2018 | referred to corporations, authorities and commissions | |||||||||||||||||||||||||||||||||||||||||||||||||
06/11/2018 | RECALLED FROM ASSEMBLY | |||||||||||||||||||||||||||||||||||||||||||||||||
06/11/2018 | returned to senate | |||||||||||||||||||||||||||||||||||||||||||||||||
06/11/2018 | VOTE RECONSIDERED - RESTORED TO THIRD READING | |||||||||||||||||||||||||||||||||||||||||||||||||
06/11/2018 | AMENDED ON THIRD READING 6861A | |||||||||||||||||||||||||||||||||||||||||||||||||
06/19/2018 | REPASSED SENATE | |||||||||||||||||||||||||||||||||||||||||||||||||
06/19/2018 | RETURNED TO ASSEMBLY | |||||||||||||||||||||||||||||||||||||||||||||||||
06/19/2018 | referred to ways and means | |||||||||||||||||||||||||||||||||||||||||||||||||
06/19/2018 | substituted for a8609a | |||||||||||||||||||||||||||||||||||||||||||||||||
06/19/2018 | ordered to third reading rules cal.318 | |||||||||||||||||||||||||||||||||||||||||||||||||
06/19/2018 | passed assembly | |||||||||||||||||||||||||||||||||||||||||||||||||
06/19/2018 | returned to senate | |||||||||||||||||||||||||||||||||||||||||||||||||
12/18/2018 | DELIVERED TO GOVERNOR | |||||||||||||||||||||||||||||||||||||||||||||||||
12/28/2018 | SIGNED CHAP.520 | |||||||||||||||||||||||||||||||||||||||||||||||||
12/28/2018 | APPROVAL MEMO.22 |
S06861 Committee Votes:
Go to topS06861 Floor Votes:
Yes
Abbate
Yes
Cook
Yes
Garbarino
Yes
Lupardo
Yes
Pellegrino
Yes
Stec
Yes
Abinanti
Yes
Crespo
Yes
Giglio
Yes
Magee
Yes
Peoples-Stokes
Yes
Steck
ER
Arroyo
Yes
Crouch
Yes
Glick
Yes
Magnarelli
Yes
Perry
Yes
Stern
Yes
Ashby
Yes
Curran
Yes
Goodell
Yes
Malliotakis
Yes
Pheffer Amato
Yes
Stirpe
Yes
Aubry
Yes
Cusick
Yes
Gottfried
Yes
McDonald
Yes
Pichardo
Yes
Tague
Yes
Barclay
Yes
Cymbrowitz
Yes
Gunther
Yes
McDonough
Yes
Pretlow
Yes
Taylor
Yes
Barnwell
Yes
Davila
Yes
Hawley
Yes
Mikulin
Yes
Quart
Yes
Thiele
Yes
Barrett
Yes
De La Rosa
Yes
Hevesi
Yes
Miller B
Yes
Ra
Yes
Titone
Yes
Barron
Yes
DenDekker
ER
Hikind
Yes
Miller MG
Yes
Raia
Yes
Titus
Yes
Benedetto
Yes
Dickens
Yes
Hooper
Yes
Miller ML
Yes
Ramos
Yes
Vanel
Yes
Bichotte
Yes
Dilan
Yes
Hunter
ER
Montesano
ER
Richardson
Yes
Walker
Yes
Blake
Yes
Dinowitz
Yes
Hyndman
Yes
Morelle
Yes
Rivera
Yes
Wallace
Yes
Blankenbush
Yes
DiPietro
Yes
Jaffee
Yes
Morinello
Yes
Rodriguez
Yes
Walsh
Yes
Bohen
Yes
D'Urso
Yes
Jean-Pierre
Yes
Mosley
Yes
Rosenthal D
Yes
Walter
Yes
Brabenec
Yes
Englebright
Yes
Jenne
Yes
Murray
Yes
Rosenthal L
Yes
Weinstein
Yes
Braunstein
Yes
Epstein
Yes
Johns
Yes
Niou
Yes
Rozic
Yes
Weprin
Yes
Brindisi
Yes
Errigo
Yes
Jones
Yes
Nolan
Yes
Ryan
Yes
Williams
Yes
Bronson
Yes
Espinal
Yes
Joyner
Yes
Norris
Yes
Santabarbara
Yes
Woerner
Yes
Buchwald
Yes
Fahy
Yes
Kim
Yes
Oaks
ER
Schimminger
Yes
Wright
ER
Butler
Yes
Fernandez
Yes
Kolb
Yes
O'Donnell
Yes
Seawright
Yes
Zebrowski
Yes
Byrne
Yes
Finch
ER
Lalor
Yes
Ortiz
Yes
Simon
Yes
Mr. Speaker
Yes
Cahill
Yes
Fitzpatrick
Yes
Lavine
Yes
Otis
Yes
Simotas
Yes
Carroll
Yes
Friend
Yes
Lawrence
Yes
Palmesano
Yes
Skoufis
Yes
Castorina
Yes
Galef
Yes
Lentol
Yes
Palumbo
Yes
Smith
Yes
Colton
ER
Gantt
Yes
Lifton
Yes
Paulin
Yes
Solages
‡ Indicates voting via videoconference
S06861 Text:
Go to top STATE OF NEW YORK ________________________________________________________________________ S. 6861--A A. 8609--A Cal. No. 1243 2017-2018 Regular Sessions SENATE - ASSEMBLY September 1, 2017 ___________ IN SENATE -- Introduced by Sen. LAVALLE -- read twice and ordered print- ed, and when printed to be committed to the Committee on Rules -- recommitted to the Committee on Corporations, Authorities and Commis- sions in accordance with Senate Rule 6, sec. 8 -- reported favorably from said committee, ordered to first and second report, ordered to a third reading, passed by Senate and delivered to the Assembly, recalled, vote reconsidered, restored to third reading, amended and ordered reprinted, retaining its place in the order of third reading IN ASSEMBLY -- Introduced by M. of A. THIELE, MURRAY -- read once and referred to the Committee on Corporations, Authorities and Commissions -- recommitted to the Committee on Corporations, Authorities and Commissions in accordance with Assembly Rule 3, sec. 2 -- reported and referred to the Committee on Ways and Means -- committee discharged, bill amended, ordered reprinted as amended and recommitted to said committee AN ACT to amend the public authorities law, in relation to requiring the Long Island Power Authority to provide public notice for the construction of utility transmission facilities The People of the State of New York, represented in Senate and Assem- bly, do enact as follows: 1 Section 1. Sections 1020-ii, 1020-jj and 1020-kk of the public author- 2 ities law, sections 1020-jj and 1020-kk as renumbered by chapter 415 of 3 the laws of 2017, are renumbered sections 1020-jj, 1020-kk and 1020-ll 4 and a new section 1020-ii is added to read as follows: 5 § 1020-ii. Public notice before approval of utility transmission 6 facilities. 1. As used in this section, the following terms shall have 7 the following meanings: 8 (a) "municipality" means a county, city, town or village in the 9 service area; EXPLANATION--Matter in italics (underscored) is new; matter in brackets [] is old law to be omitted. LBD13310-04-8S. 6861--A 2 A. 8609--A 1 (b) "utility transmission facility" means any electric transmission 2 line in the service area, including associated equipment. It shall not 3 include any transmission line which is an in-kind replacement or which 4 is located wholly underground. This section also shall not apply to any 5 major utility transmission facility subject to the jurisdiction of arti- 6 cle seven of the public service law; and 7 (c) "utility customer" means the customer of record located within 8 five hundred feet of a proposed utility transmission facility. 9 2. The authority shall not construct any utility transmission facility 10 without first providing public notice as provided by this subdivision. 11 Such public notice shall be provided by the authority before the envi- 12 ronmental significance of such action is determined by the authority, 13 pursuant to article eight of the environmental conservation law. The 14 public notice shall provide the following information: 15 (a) the location of the site or right-of-way; 16 (b) a description of the transmission facility to be built thereon; 17 (c) the environmental assessment or environmental impact statement 18 prepared for the action, pursuant to article eight of the environmental 19 conservation law; 20 (d) a summary of any studies which have been made of the environmental 21 impact of the project, and a description of such studies; 22 (e) a statement explaining the need for the facility; 23 (f) a description of any reasonable alternate location or locations 24 for the proposed facility; 25 (g) a description of the comparative merits and detriments of each 26 location submitted; and 27 (h) a statement of the reasons why the primary proposed location is 28 best suited for the facility. 29 Copies of the environmental assessment form, environmental impact 30 statement and studies referred to in the notice shall be filed with the 31 authority and shall be available for public inspection. 32 3. Notice shall be provided by first class mail to: 33 (a) each municipality in which any portion of such facility is to be 34 located, both as primarily proposed and in the alternative locations 35 listed. Notice to a municipality shall be addressed to the chief execu- 36 tive officer thereof; 37 (b) each member of the legislature through whose district the facility 38 or any alternate proposed in the application would pass; and 39 (c) each utility customer. 40 § 2. This act shall take effect immediately.